Forum quick links
appeal timeline
posted by Therese Thompson on
We've received our final review report and will have to appeal a decision on EAp2, which also affects two credits.
100% OA multiple zones system
NC-2009 IEQp1:Minimum IAQ Performanceposted by Charline SEYTIER on
Hi Everyone, We are currently working on a project including an 100% OA AHU providing ventilation to 3 different areas. The same people (110 people on peak) will be moving between those 3 areas d
Stadium seating - need SRI? Is it an appurtenance/usable space?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Marcio Alberto Casado Pereira on
We just got a review from a stadium Project we are working on in Brazil and the review team asked us to double check the roof area considered, stating that part of our seating area covers enclosed
Occupancy for indoor/outdoor building types
NC-2009 PIf3:Occupant and Usage Dataposted by Keelan Kaiser on
We have a project that is a large outdoor amphitheater, with a roof, but an unconditioned outdoor space. It has an adjoining building for all of the back of house uses.
Medical Supplies
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Aurélie Kazour on
I am working in a hospital trying to meet the Sustainable Purchasing standards.
Contract between owner and CxA
NC-2009 EAc3:Enhanced Commissioningposted by Gina Dederer on
We recently had this credit denied based on the fact that our contract did not explicitly state that the 10 month follow-up review is included in the activities of EAc3, even though we provided a c
Commissioning of renewable energy systems
NC-2009 EAc3:Enhanced Commissioningposted by Peg Manuel on
EAc3 requires the individual serving as the CxA to "be independent of the work of design and construction." It also states this person "must not be an employee of, or contravted through a contracto
Stair nosing
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Yuko Murata on
Hi Everyone, We have stainless steel stair nosing with anti-slip PVC strips on our stairs.
LEED: Homes eligibility?
posted by Erica Downs on
Hello - We are starting major construction of our home, consisting of a gut-reno of the first floor; addition of a 2nd floor plus attic and porch; new mechanical systems, plumbing, electrical, wind