Providing clarifications to Design Phase Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Susannah Goddard  on 

Our project has just received the Design Phase Review feedback from USGBC and we are now in the process of addressing the issues raised with some of the credits.

7
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Dec 4, 2014, 4:05 pm

Retail Loading docks

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Sunayana Jain  on 

According to LEED for Retail, "employ permanent entryways systems for all entrances including back-of-house areas such as loading docks or service areas." In my case loading docks will only used f

5
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Dec 4, 2014, 5:10 am

Supplemental Table 1.4 - reviewers comment

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, I've received a comment from a reviewer, that insufficient info regarding VAV reheat terminal units are provided in this table.

3
Wed Dec 3, 2014, 7:17 pm

Views from a single occupancy dorm/bed room

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Nelina Loiselle  on 

Hello, I am working on a dorm project that has some single occupancy bed rooms with access to views.

4
Wed Dec 3, 2014, 1:23 pm

Handicap Access

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Mary Grace Wong  on 

Our building has a separate main entrance and handicap access (which includes an elevator to travel between street level and lobby vertically).

2
Tue Dec 2, 2014, 9:02 pm

Column Veneer preserved but covered

NC-2009 MRc2:Construction Waste Management
posted by  Madhura Dhayagude  on 

We are working on a project where the client wants to preserve the existing column veneer, however they want to cover the whole column with a new finish.

3
Tue Dec 2, 2014, 7:46 pm

Option 2 Simulation

NC-v4 EQc7:Daylight
posted by  Charalampos Giannikopoulos  on 

For Option 2 (Simulation) is it accepted to run the simulation for 9.00 and 15.00 on September 21 only, or should it be repeated for March 21st and get the average of both?

2
Tue Dec 2, 2014, 6:58 pm

Fixtures included in WEp1.

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Bernardo Ruiz Montoya  on 

Hi, I believe that I already know the answer but I want to present my doubt to you as a double-check.

4
Tue Dec 2, 2014, 4:09 pm

Energy Model Scope - Shared HVAC Plant

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  TOMAS URIBE  on 

Hello there. We have a project that will be applying for LEED certification under CI. The project is located on 4th floor within an office building with 5-floors.

3
Electrical Design Engineer
Pakistan Green Building Council
LEEDuser Basic Member
0 thumbs up
Tue Dec 2, 2014, 3:57 pm

Exterioir Lighting - Non tradable

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, In the project I'm modeling, in the Proposed project there is a Building facades exterior lighting which LPD is bigger than the allowed values of 0.2 W/ft2.

5
Tue Dec 2, 2014, 2:29 pm