Providing clarifications to Design Phase Review
posted by Susannah Goddard on
Our project has just received the Design Phase Review feedback from USGBC and we are now in the process of addressing the issues raised with some of the credits.
Retail Loading docks
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Sunayana Jain on
According to LEED for Retail, "employ permanent entryways systems for all entrances including back-of-house areas such as loading docks or service areas." In my case loading docks will only used f
Supplemental Table 1.4 - reviewers comment
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, I've received a comment from a reviewer, that insufficient info regarding VAV reheat terminal units are provided in this table.
Views from a single occupancy dorm/bed room
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Nelina Loiselle on
Hello, I am working on a dorm project that has some single occupancy bed rooms with access to views.
Handicap Access
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Mary Grace Wong on
Our building has a separate main entrance and handicap access (which includes an elevator to travel between street level and lobby vertically).
Column Veneer preserved but covered
NC-2009 MRc2:Construction Waste Managementposted by Madhura Dhayagude on
We are working on a project where the client wants to preserve the existing column veneer, however they want to cover the whole column with a new finish.
Option 2 Simulation
NC-v4 EQc7:Daylightposted by Charalampos Giannikopoulos on
For Option 2 (Simulation) is it accepted to run the simulation for 9.00 and 15.00 on September 21 only, or should it be repeated for March 21st and get the average of both?
Fixtures included in WEp1.
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Bernardo Ruiz Montoya on
Hi, I believe that I already know the answer but I want to present my doubt to you as a double-check.
Energy Model Scope - Shared HVAC Plant
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by TOMAS URIBE on
Hello there. We have a project that will be applying for LEED certification under CI. The project is located on 4th floor within an office building with 5-floors.
Exterioir Lighting - Non tradable
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In the project I'm modeling, in the Proposed project there is a Building facades exterior lighting which LPD is bigger than the allowed values of 0.2 W/ft2.