Can Ice rink and Ski centre be excluded
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Leanne Niu on
Recently, i am working for a complex commercial project including a ice rink and a ski centre. These two spaces are acturally very special, whether we can exclude them when we consider thermal comf
Non-smoking campus - are exterior signs required?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Renee Shirey on
My project is on a college campus that is non-smoking on the entire campus, there are no areas with permitted smoking. The streets themselves are university property, not public streets.
Sensor based lavatory faucet compliance
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Faisal on
Hi, How should be the compliance (of 0.25gpc) for sensor based lavatory faucet be checked if the manufacturer mentions only “ adjustable from 1 - 20 minutes “ , the model in question is EAF-200-P-
PFP fan allowance in Table 1.4
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
I have a VAV with PFP system for basecase, and I need to know how to count for the zone fan power in table 1.4, knowing that I did enter each AHU's fan power from the Energy model to table 1.4, the
Can FEV/LEV Spaces In Existing Parking Areas Count?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Tim Gaidis on
Hi all - I'm working on a v3 NC major renovation project.
Who can be CxA?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Allan Vásquez on
How do I know which projects are a similar managerial and technical complexity than the one I am working on?
What if other element meets the intend of the credit ?
Pilot-Credits EQpc78:Design for active occupantsposted by George Sebastian Naghiu on
What if we have an element that meets the intend of the credit but is not included in the list of 11 features from which to choose?
Glazing (windows) area - VOC
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Dear all, Does we need to integrate glazing area in Option 2 : Budget calculation method ? Thank you for your help
System 8 Fan Power Allowance
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Dear All, I have a system 8 (VAV with PFP boxes) baseline and I had a reviewer's comment stating that: "The interior fan demand reported in Table EAp2-4 for the Baseline case exceeds th
Certification RQs for Incomplete Building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Orçun Özhelvaci on
Our university building undergoes it's construction stage.