educational/office building project
posted by Courtney Royal on
can any help me find the avg. peak parking demand of an office building? i just can't see myself asking the project to purchase this report just for one simple number! thanks so much, Courtney
Adding floors to existing building, plus addition
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Erica Downs on
Our project is reusing an existing church, and adding an adjacent 4-story wing, with a connector in the middle.
LEED Volume Program - Submittal Guidance
posted by Grace Ming on
Hello all, I am looking for the following documents regarding the LEED Volume certification: 1) LEED Volume Program: Submittal Guidance for Design and Construction 2) LEED Volume Program: Submit
Take credit for variable temperature setpoints in hotel rooms
NC-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
We have a hotel project where heating setpoints in hotel guest rooms are 21 degrees Celsius when the room is occupied and lowered to 18 degrees Celsius when the guests are not in the room.
2 Buildings in a unique Hotel
NC-2009 EAp2:Minimum Energy Performanceposted by Antonio Marquez Briones on
We have one unique boiler, that feeds two buildings inside the LEED boundary of the hotel. Must we do two energy models, with two set of input/output reports?
Want to Appeal Denied SSc4.3
posted by Rachel Manoguerra on
We have submitted our design review and we got the report back. We want to appeal the about mentioned credit. In making our changes, the number of parking spaces has decreased by 6.
Lighting Energy Efficiency as a Lease requirement
CS-2009 EAp2:Minimum Energy Performanceposted by Scott McMillan on
We are compiling the LEED submission for an office tower that may have multiple tenants on each floor.
Waste management pro-rate surface logic for two buildings
CS-2009 MRc2:Construction Waste Managementposted by Ian McCall on
Dear LEEDers, Question : We would like to monitor & manage the construction waste for the whole site and then pro-rata by surface area the recycling percentage for each building office &
ASHRAE 55 Compliance in Dubai
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Annalise Reichert on
I am working on a project in Dubai, the design engineer has performed a psychrometric analysis using 46.0°C (DB) and 29°C (WB) for climatic design cooling conditions.
Reactivating construction with ESC Plan, no ESC Plan before
NC-2009 SSp1:Construction Activity Pollution Preventionposted by LEED Pro Consultant on
Hello! We have a project that started construction some time ago, and stopped 1 yr ago, leaving only the foundation. At this time, they were not considering LEED as an objective.