Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

MR 5 Regional Materials

NC-2009 MRc5:Regional Materials
posted by  Derek Darby  on 

I am fairly new to LEED so please bare with me on this one. We are a manufacturer and sell assembled products to the customer.

6
Default Avatar
Senior Project Manager
Engineering Specialties Co.
LEEDuser Basic Member
0 thumbs up
Thu Aug 20, 2015, 8:12 pm

Renovation project Envelope question

NC-2009 EAc1:Optimize Energy Performance
posted by  Saju Varghese  on 

I'm not really sure how the envelope should be input in baseline vs. proposed.

3
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Thu Aug 20, 2015, 5:59 pm

Walk-Off on exterior and interior

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Aaron Levine  on 

An earlier comment said that, "LEED Interpretation #10098 seems to be saying that, if your entry system is at the exterior &/or less than 10 feet long, you will need to write a darned good just

8
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Aug 20, 2015, 2:19 am

Edit PIf4

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Omar Elrawy  on 

Dear all, I had my preliminary design review, where I got notes on EAp2, and IEQp1.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Thu Aug 20, 2015, 9:02 am
3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Aug 19, 2015, 12:14 am

2 energy point requirement

NC-2009 EAc1:Optimize Energy Performance
posted by  Mike Stopka  on 

I just wanted to verify that "Two (2) points mandatory for all LEED for New Construction projects registered after June 26, 2007" rule is no longer in effect. Referring to this: http://www.usgbc.o

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Aug 18, 2015, 2:08 pm

Green Products for Integrated Pest Management Plan

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Yong Lee Low  on 

Hi All, Can I check if the local green certification for products can be used in place of Green Seal products for the integrated pest management plan, as well as other policies, e.g.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Aug 18, 2015, 1:41 am

Must non-potable water sources be used to earn IP credit?

NC-v4 IPc1:Integrative process
posted by  Eesmyal Santos-Brault  on 

It appears that this credit can not be earned if a project does not meet some water demand through nonpotable sources.

7
Mon Aug 17, 2015, 8:02 pm

non-aerosol spray adhesives?

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Erin Holdenried  on 

For a non-aerosol spray adhesive, must it comply with SCAQMD 1168 or GS-36?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Aug 17, 2015, 4:41 pm

Extent of Documentation

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  David Browne  on 

I know from having attempted this credit on other projects that the documentation can be tedious, but I have a current project where it seems ridiculous.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Aug 14, 2015, 3:40 pm