REC Certificate - Renewable Energy

NC-2009 EAc2:On-Site Renewable Energy
posted by  SAMY Chamy  on 

Dear All:- Our project don't have any Renewable energy such as Solar, Windmill so we plan to Buy a REC certificate for our Entire energy use (100%) as per ID -10161 1.Is it possible to get EAc2,

3
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Sun Apr 24, 2016, 11:54 pm

LEED NC: MR or LEED EBOM

LEED Rating System Selection
posted by  ABDUL MUTHALIB MOHAMED  on 

We have a manufacturing facility that under going addition of 30% of total floor area and wish to apply for LEED certification. Can we use the LEED NC? or Should we use LEED EBOM?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat Apr 23, 2016, 4:51 am

Using NO VOC's in a building

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Patrice McVeigh  on 

Hi, I am working on a Core and Shell project that is not using any VOC containing products, can this project still gain this credit as no VOC products are being used and therefore VOC Emittance is

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Apr 22, 2016, 11:27 pm

correction for online reference guide

NC-v4 SSc4:Rainwater management
posted by  Lyle Axelarris  on 

I have subscribed to access for the online v4 Reference Guide, and I noticed a couple of mistakes in the example for this credit.

4
Fri Apr 22, 2016, 8:04 pm

Option 1 Path 2 Temperature and Humidty Requirements

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Amy Harmon  on 

Path 1 indicates flush-out needs to be accomplished with 14,000 cu ft. of OA per sq. ft. of floor area while maintaining an internal temperature of at least 60 deg F and no more than 60% RH.

3
Default Avatar
Scheeser Buckley Mayfield
LEEDuser Basic Member
0 thumbs up
Fri Apr 22, 2016, 2:07 pm

ventilation levels

NC-2009 EAp2:Minimum Energy Performance
posted by  Tristan Roberts  on 

I got this question via email and thought I would post it here for your help. Thanks!

4
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Thu Apr 21, 2016, 7:51 pm

3 LEED projects sitting on a parking & retail layer cake

NC-2009 MRc4:Recycled Content
posted by  Susan Di Giulio  on 

Hi, We have a campus master site occupying a city block. There are 7 podium floors with a hotel, condo towers and retail sprouting from them that are parsed into 3 separate LEED projects.

6
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Apr 21, 2016, 5:50 pm

Bike Racks Calculation for the 1928456ft2 Rapid Train Station

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Orçun Özhelvaci  on 

Dear All, We have confronted with 1 complicated issue regarding Bike Rack numbers. The gross floor area 1.928.456 ft2 Rapid Train Station with its Hotel, Restaurant and Mall.

3
Facilities manager
Prime project International Dubai
LEEDuser Basic Member
0 thumbs up
Thu Apr 21, 2016, 4:16 pm

REVIT 2016 Daylight Analysis Tool not acceptable?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Deborah Lucking  on 

We submitted for this credit using the results from the REVIT 2016 daylight analysis tool.

2
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Thu Apr 21, 2016, 12:39 pm

Residential Requirements

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Brightworks Sustainability  on 

Hi all, I am working on a graduate housing project that is all residential, and some apartments have doors directly to the outdoors. What are the walk-off mat alternate requirements in this case?

2
Wed Apr 20, 2016, 3:01 pm