Hi! We did some parameter studies in the early stage of the design process. Now i am wondering if we can use them for documentation of this credit.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Aug 15, 2016, 7:02 am

PV Energy sent to Local Grid - Eligibility for EA c1 & EA c2

NC-2009 EAc2:On-Site Renewable Energy
posted by  varun potbhare  on 

I am working on Museum Project in Doha. Owner of the Museum intends to install 3000 panels on the car park.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Aug 15, 2016, 5:38 am

Exemplary Performance

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Allen Cornett  on 

Can exemplary performance be documented by combining Option 1 and Option 2?

2
Fri Aug 12, 2016, 10:27 pm

Finishing materials will be specified by future tenant

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Gabriela Hernández Castillo  on 

In our project ownership will provide flooring finishings on commun area, but the leasable area will remain only as concrete so future tenant will install its own flooring. Do we need to include t

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Fri Aug 12, 2016, 9:27 pm

Comments on Stair Distance Requirements

Pilot-Credits EQpc78:Design for active occupants
posted by  Jeremy Knoll  on 

Like Nate, I also like the intentions of this credit.

7
senior design professional
HOK
LEEDuser Basic Member
0 thumbs up
Fri Aug 12, 2016, 6:39 pm

n/a

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Anastasia Makarenko  on 

Dear all, our project is being certified under LEED v3 NC. at the Preliminary Design Review Stage we've divided users into occupant groups in accordance with their functionality - office workers, k

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Fri Aug 12, 2016, 11:59 am

Exterior lighting classification -

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Ricardo Sá  on 

Hi, I’m currently working on a LEED 2009-CI project applied to a hypermarket and I’m having doubts in classifying some surfaces according to table 9.4.5 of ASHRAE 90.1 2007 (“Lighting Power Densi

2
Thu Aug 11, 2016, 9:12 am

Ventilation and filteration for Staircase for Feature 64

WELL v1 Building Standard Tip Sheet
posted by  Xinrong Zhao  on 

Hello, Thank you Tristan for adding a WELL discussion to this site. My rpoject is an 18 floor residential project. The staircase is use for Fire exits.

3
Wed Aug 10, 2016, 8:46 pm

VOC product category

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  soha yamani  on 

we are trying to identify a product to check its VOC limit, however, the supplier identified the product as Prefabricated Architectural Multi- Component and touch up from RULE 1107.

2
Tue Aug 9, 2016, 10:52 pm

0.5m margin and work-space adjacent to the glassed facade

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Anna Korinkova  on 

Hello, For dayligting simulations, there is usually a 0.5m margin applied around the perimeter of the room, excluding the area from the assessment.