Forum quick links
Energy-related systems
NC-v4 IPc1:Integrative processposted by Lise Dannesboe on
Hi! We did some parameter studies in the early stage of the design process. Now i am wondering if we can use them for documentation of this credit.
PV Energy sent to Local Grid - Eligibility for EA c1 & EA c2
NC-2009 EAc2:On-Site Renewable Energyposted by varun potbhare on
I am working on Museum Project in Doha. Owner of the Museum intends to install 3000 panels on the car park.
Exemplary Performance
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Allen Cornett on
Can exemplary performance be documented by combining Option 1 and Option 2?
Finishing materials will be specified by future tenant
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Gabriela Hernández Castillo on
In our project ownership will provide flooring finishings on commun area, but the leasable area will remain only as concrete so future tenant will install its own flooring. Do we need to include t
Comments on Stair Distance Requirements
Pilot-Credits EQpc78:Design for active occupantsposted by Jeremy Knoll on
Like Nate, I also like the intentions of this credit.
n/a
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Anastasia Makarenko on
Dear all, our project is being certified under LEED v3 NC. at the Preliminary Design Review Stage we've divided users into occupant groups in accordance with their functionality - office workers, k
Exterior lighting classification -
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Ricardo Sá on
Hi, I’m currently working on a LEED 2009-CI project applied to a hypermarket and I’m having doubts in classifying some surfaces according to table 9.4.5 of ASHRAE 90.1 2007 (“Lighting Power Densi
Ventilation and filteration for Staircase for Feature 64
posted by Xinrong Zhao on
Hello, Thank you Tristan for adding a WELL discussion to this site. My rpoject is an 18 floor residential project. The staircase is use for Fire exits.
VOC product category
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by soha yamani on
we are trying to identify a product to check its VOC limit, however, the supplier identified the product as Prefabricated Architectural Multi- Component and touch up from RULE 1107.
0.5m margin and work-space adjacent to the glassed facade
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Anna Korinkova on
Hello, For dayligting simulations, there is usually a 0.5m margin applied around the perimeter of the room, excluding the area from the assessment.