Restroom ventilationNC-2009 IEQp1: Minimum indoor air quality performanceposted by Alexia Anastassiadis on Feb 1, 2011, 10:21 pm
We are working on a major renovation project and the restrooms have natural ventilation. Do we have to provide additional mechanical exhaust to comply with ASHRAE? Will having natural ventilation... Last reply: David Hubka, Feb 24, 2011, 4:04 pm |
|
Industrial Plant Manufacturing Hall VentilationNC-2009 IEQp1: Minimum indoor air quality performanceposted by Sustainability Provider on Feb 3, 2011, 12:08 pm
We are currently working on the design of an industrial plant (aluminum casting in specifics) with two sections - manufacturing hall and administrative/engineering offices. (They are directly... Last reply: David Hubka, Feb 24, 2011, 3:54 pm |
|
Clarification on Minimum Daily Transit ServicePilot-Credits PC12: Reduced Automobile Dependenceposted by Colin Inderwish on Feb 16, 2011, 12:50 pm
We're also attempting option 1. The project is located in a fairly dense area with a total of 4 different... Last reply: Fred Dock, Feb 24, 2011, 3:20 pm |
|
online formNC-2009 MRc2: Construction Waste Managementposted by Rick Vayo on Feb 14, 2011, 11:03 pm
Hi, I'm having trouble with the online form. I've filled in the required information, but the percentage of waste diverted is not totaling for me. I'm not sure what I'm doing wrong. ... Last reply: Valerie Walsh, Feb 24, 2011, 2:48 pm |
|
minimum area of neighborhood required?NC-2009 SSc2: Development Density and Community Connectivityposted by Pete Larsen on May 26, 2010, 3:30 pm
The credit requires the site to be within 1/2 mile of a neighborhood with minimum 10 units per acre. Is there a minimum area of neighborhood required? For example, does 10% (or any particular... Last reply: Larry Jones, Feb 24, 2011, 1:50 pm |
|
Unit ClarificationCI-2009 SSc2: Development Density and Community Connectivityposted by Heather Eberhardt on Dec 6, 2010, 1:47 pm
I wanted to know if anyone could tell me how many units you need in a half a mile radius. I am a little confused on how to calculate the 10 units per acre. Last reply: Larry Jones, Feb 24, 2011, 12:19 pm |
|
Metallic Glaze that is LEED complaintNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Megan Bove on Feb 22, 2011, 7:54 am
In reviewing submittals with the painting trade on my project, we came across the specified a specified paint that we are looking for a substitute. The reason for this is the product does not... Last reply: Tristan Roberts, Feb 24, 2011, 10:52 am |
|
Electric bicycles in AsiaNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Louise Schlatter on Jan 31, 2011, 1:48 pm
We are starting to get projects in Asia and have learned that they use both standard (human operated) bicycles and also something we don't have in the US: electric bicycles. These are not... Last reply: Melissa Merryweather, Feb 24, 2011, 10:16 am |
|
Phased Occupancy and IAQ TestingCI-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Melissa Wrolstad on Feb 22, 2011, 5:11 pm
I have a CI project with 4 floors and phased occupancy. Two floors will be occupied while two are still under construction. Is it possible to split... Last reply: Susann Geithner, Feb 24, 2011, 9:53 am |
|
Cleaning contract for roll out matsCS-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by V. Miller on Feb 24, 2011, 12:56 am
LEED User credit checklists for this credit indicate that a copy of the cleaning contract must be provided. However, the roll out mat section of the tempalte does not have an upload button, or... Last reply: Allison Beer McKenzie, Feb 24, 2011, 8:44 am |