Forum quick links
Lease Duration
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Michelle Rosenberger on
I see some threads on this issue but want to re-open this conversation. We have CI projects that are in buildings that have executed leases with a 10 year duration.
postponing a construction credit
posted by Omar Elrawy on
I need to know what if I decide to submit sum, and not all, of the construction credits during construction preliminary submittal, and postpone some others for the construction final submittal.
Ecotect Daylight Autonomy and Insolation levels Analysis
NC-v4 EQc7:Daylightposted by Greenlab on
Hello, I'm trying to answer the V4 BD+C (New Construction and Major Renovation) daylight credit through option 1 (SDA+ASE).
Metering Requirements
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Ciaran McCabe on
Hi, I am working on a commercial project that consists of retail units on the ground floor and offices on the levels above.Currently the base build does not show and ten ant metering for the retail
What defines complex occupancy?
NC-2009 PIf3:Occupant and Usage Dataposted by Jeannie Rueter on
I'm working on a conference center major renovation where the employees work 40 hours per week.
Wood pellets as a Renewable energy source
NC-2009 EAc2:On-Site Renewable Energyposted by Vassil Vassilev on
We are at conceptual design stage for a new school building.
n/a
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Anastasia Makarenko on
Our project is an extension of existing project for manufactory. Existing site has building, parking for cars and bicycles, paving etc.
Daylight controls / sensors vs Occupancy Sensors or Both?
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Katie Peterschmidt on
Hello all - We have a CI project that has "Occupancy Sensors" around the perimeter of the space within 15' of the windows.
Lawn acceptance
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Patrice McVeigh on
Hi, We have received comments on the lawn areas of our project which states “lawn is acceptable only if it a) is not a monoculture, b) does not require regular maintenance or mowing, and c) does n
LEED-CI without an energy model
CI-2009 EAc3:Measurement and Verificationposted by Brightworks Sustainability on
I'm working on a LEED-CI project occupying 100% of the tenant space.