Topic | Recent |
---|---|
Non-structural wall resurfacingSchools-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by James Ketter on Mar 16, 2011, 1:01 pm
Our project has existing non-structural plaster walls that will be reused in place. The current design calls for touch up of existing plaster walls, but the owner is also contemplating full skip-... Last reply: Tristan Roberts, Mar 29, 2011, 9:45 am |
|
LEED certification without heating and cooling systemsNC-2009 EAp2: Minimum Energy Performanceposted by Felipe Duran on Mar 16, 2011, 12:32 pm
I am working on a school project and it does not consider a heating system nor a cooling system at all ¿Is it possible to certified a building which does not have a these systems and therefore... Last reply: Keith Steurer, Mar 29, 2011, 9:04 am |
|
Water Use Reduction calculations- kitchen / food service sinkSchools-2009 WEc3: Water Use Reductionposted by Gendel Metlitsky on Nov 10, 2010, 9:24 am
Has anyone experience how to enter calculations for school kitchen / food services sink – by how many people and how many times a day used should be entered into calculations? Last reply: Tristan Roberts, Mar 29, 2011, 8:57 am |
|
Vertical Green Counts?EBOM-2009 SSc5: Site development - protect or restore open habitatposted by yu-ju Kao on Mar 29, 2011, 7:07 am
Does installing a vertical wall in building facade or interior contribute to this credit? I assume that doing so will also promoting biodiversity. Last reply: Tristan Roberts, Mar 29, 2011, 8:23 am |
|
Existing LIghting- Commercial InteriorCI-2009 EAp2: Minimum Energy Performanceposted by John Bauer on Jun 13, 2010, 6:35 am
We are doing a fit-out for 1 floor in an existing building in China. The Shell and Core installation provided by the landlord includes the lighting fixtures. So my question is if this existing... Last reply: Billy Ng, Mar 29, 2011, 3:41 am |
|
5 star Energy Star HouseEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by John Kinch on Mar 23, 2011, 6:00 pm
Hello again, Our facility is already a 5 star energy rated building. Is there any way to cut corners on this paperwork? Thanks! Last reply: Tristan Roberts, Mar 29, 2011, 12:52 am |
|
IAQ Testing and FurnishingsSchools-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Q + on Mar 21, 2011, 5:28 pm
The Credit Language contains this statement regarding air quality testing and furnishings: "Movable furnishings such as workstations and partitions should be in place for the testing, although... Last reply: Tristan Roberts, Mar 29, 2011, 12:38 am |
|
Phased IAQ Testing?Schools-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Q + on Mar 21, 2011, 5:08 pm
Is it acceptable to perform air quality testing in phases? The project in question is a 175K sf school designed in 7 zones. We would like to begin testing on half of these zones while test and... Last reply: Tristan Roberts, Mar 29, 2011, 12:36 am |
|
Single Ply Roof Membrane AdhesivesNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Dwayne Wacenske on Jun 2, 2010, 2:33 pmof you have seen this, but for those that are just referencing this forum thread related to roofing sealants, please see below information from the updated GBD&C 2009 addendum. All comments are dated... Last reply: Tristan Roberts, Mar 29, 2011, 12:29 am |
|
7th ed. Massachusetts Building Code and ASHRAE 62.1-2004NC-2009 IEQc2: Increased Ventilationposted by Paul Girello on Jan 15, 2010, 3:31 pm
I am working on a building that is actually registered under v2.2 and using ASHRAE 62.1-2004 or local code for this credit which Mass State Building Code 7th ed. According to the engineers, the... Last reply: Tristan Roberts, Mar 29, 2011, 12:23 am |