Topic | Recent |
---|---|
EA Prereq 2- precertification formCS-2009 EAp2: Minimum Energy Performanceposted by Adam Targowski on Aug 2, 2011, 7:12 am
In the precertification form for EA Prereq 2 Minimum Energy Performance after selection of the appropriate compliance path (which in my case is Whole building energy simulation) there is another... |
|
75% Whole Building ReusePilot-Credits PC19: Whole Building Reuseposted by Bradley Guy on Aug 1, 2011, 5:19 pm
Hello Heather, |
|
Equipments to be commissionedNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Alvaro Valdivia on Jul 31, 2011, 2:54 am
Hi: I have a boubt about the water heating equipment to be commissioned. In a production plant there are two boilers (water heating and steam), and heat recovering (to heat water) from three... Last reply: Scott Bowman, Aug 1, 2011, 10:19 am |
|
Information: Regional Priority Credit on International Projects?CI-2009 EAc1.2: Optimize energy performance - lighting controlsposted by Raymond Loo on Jul 28, 2011, 9:53 pm
My understanding is that an extra Regional Priority Credit can be earned on international projects here. Does anyone have any details to the actions required to get this RPC point? Last reply: Raymond Loo, Jul 29, 2011, 10:15 pm |
|
5% Requirement ClarificationEBOM-2009 WEc3: Water Efficient Landscapingposted by Marie Gruel on Jul 29, 2011, 1:20 am
I have a zero lot line project,... Last reply: Tristan Roberts, Jul 29, 2011, 1:21 pm |
|
Case 2 Site with little decrease in Impervious RatiosNC-2009 SSc6.1: Stormwater design - quantity controlposted by ryan mclean on Jul 5, 2011, 11:14 am
I am in the processing of accessing the feasibility of attaining this credit with a site that is currently 88% impervious and the proposed site is roughly 81% impervious. While i will be able to... Last reply: Susann Geithner, Jul 29, 2011, 10:44 am |
|
Exempt compoundsNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Paola Figueiredo, Newton Figueiredo on Jul 15, 2011, 5:07 pm
The LEED´s definition of... Last reply: Susan Walter, Jul 28, 2011, 2:46 pm |
|
Interior concrete stainSchools-2009 IEQc4.2: Low-Emitting Materials—Paints and Coatingsposted by Chris Sanders on Jun 22, 2011, 2:12 pm
Does interior concrete floor stain fall into the Floor Coatings category, with 100 g/L... Last reply: Dwayne Fuhlhage, Jul 28, 2011, 1:15 pm |
|
Flag Pole Light & ASHRAE LPD calculationsEBOM-2009 SSc8: Light Pollution Reductionposted by Art Kamm on Jul 28, 2011, 1:03 pm
ASHRAE/IESNA Standard 90.1-2007 does not specify on... |
|
Compliance if there are no fixtures on the designCS-2009 WEc3: Water Use Reductionposted by Jose Salinas on May 26, 2011, 11:31 am
Hi, Last reply: Devon Bertram, Jul 28, 2011, 12:43 am |