Topic | Recent |
---|---|
Pre-rinse spray valvesCS-2009 WEp1: Water Use Reductionposted by Tapio Peltonen on Aug 4, 2011, 3:51 am
LEED-CS 2009 form WEp1 version 4.0 states the following: Last reply: Susann Geithner, Sep 1, 2011, 9:42 am |
|
DewateringNC-2009 SSp1: Construction Activity Pollution Preventionposted by Daniel Bulley on Mar 9, 2010, 2:36 pm
Would dewatering at a site (from excavation to a storm drain)have an impact on this prerequisite or stormwater credit? Last reply: Emily Catacchio, Aug 31, 2011, 5:40 pm |
|
Shading of HardscapesEBOM-2009 SSc7.1: Heat island effect - nonroofposted by JOHN COOK on Aug 30, 2011, 7:19 pm
We want to show that we are shading our hardscape but performing the necessary modeling of vegetation shadows at 10am, 12noon and 3pm on the summer solstice is proving difficult. However we do... Last reply: David Posada, Aug 31, 2011, 2:02 pm |
|
Addenda revisions--- building vs tenant spaceCI-2009 WEc1: Water Use Reductionposted by Lida Lewis on Aug 20, 2010, 2:51 pmin the Reference Guides and addenda, however, there are some small things like this to look out for. That's one thing this forum is good for. Log in or register to post comments Stacey Olson SW Regional Design... Last reply: Stacey Olson, Aug 31, 2011, 1:43 pm |
|
Recycled Steel contentNC-2009 MRc4: Recycled Contentposted by Katie Ellsworth on Jul 27, 2011, 2:32 pm
We have several steel items that have been purchased for our contractors project. Most of the items show a total... Last reply: Keith Lindemulder, Aug 31, 2011, 12:42 pm |
|
Ooptimize Energy PerformanceCS-2009 EAc1: Optimize Energy Performanceposted by Paula Hernandez on Aug 31, 2011, 11:03 am
I am not sure how to estimate a Core & Shell lighting Schedule for an office building, would somebody help me, Last reply: Susann Geithner, Aug 31, 2011, 11:46 am |
|
LEED Retail CI customer and FTE calculationsCI-2009 WEc1: Water Use Reductionposted by Jeanne Varney on Aug 12, 2011, 12:54 pm
For LEED Retail CI, to calculate the WEc1 water reduction you have to input the number of... Last reply: Susann Geithner, Aug 31, 2011, 11:40 am |
|
Multi-family residential- ASHRAE 62.1 2007- ch. 5 Natural VentNC-2009 IEQp1: Minimum indoor air quality performanceposted by Michele Helou on Aug 18, 2011, 11:22 am
We have a mixed use retail - residential project with the residential units relying on natural ventilation with the required 4% operable window area to floor area ratio. Last reply: Michael Wironen, Aug 31, 2011, 9:55 am |
|
LEED Certification for Phase wise constructionNC-2009 MRc4: Recycled Contentposted by Ramesh Narayanan on Aug 29, 2011, 6:42 am
Dear Sir/Madam, I have few clarification of whether the old constructed portion material should be considered for all the materials credits. Project Details: The building has... Last reply: Ramesh Narayanan, Aug 30, 2011, 1:50 am |
|
Modern methods of constructionNC-2009 MRc2: Construction Waste Managementposted by Bradley Guy on Aug 20, 2011, 5:54 pm
In its current form the MRc2 is for diverting waste that has been created, it does not credit 'preventing' waste, however please take a look at the LEED 2012 2nd public comment version of this... Last reply: Susan Walter, Aug 29, 2011, 1:46 pm |