Baseline Vs Design CaseEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Simon Sue on Aug 17, 2010, 11:26 pm
will it be ok for submission if my faucet deisgn case gpm is double the baseline standard. Last reply: Kimberly Ja, Oct 10, 2011, 5:45 pm |
|
LEED CI 2004, Credit 1.1 Optimize Energy PerformanceCI-2009 EAc1.1: Optimize energy performance - lighting powerposted by David Rodriguez on Aug 17, 2011, 8:14 pm
When reviewing the CI forms from an older project that were filled out by a consultant, I noticed they had taken 10% credit towards the installed lighting power for occupancy sensor control of... Last reply: Dan LeBlanc, Oct 10, 2011, 5:33 pm |
|
Using a water table tank as a retaining method for complianceCS-2009 SSc6.1: Stormwater design - quantity controlposted by Gabriela Hernández Castillo on Oct 8, 2011, 1:27 pm
Our project is capturing rainwater and sending it to a water table tank (I don't know if this is the correct term, it is the tank that recieves water from the water table below foundations).... Last reply: David Posada, Oct 10, 2011, 3:49 pm |
|
Exceptional calculation- hot water use reduction in hotelNC-2009 EAc1: Optimize Energy Performanceposted by Christine Robbins-Elrod on Oct 10, 2011, 12:56 pm
We're working on a hotel that will have a reduction in hot water consumption throughout the hotel (particularly in the guestrooms, where 2.0 GPM showerheads and 1.0 GPM faucet aerators will be... Last reply: Marcus Sheffer, Oct 10, 2011, 3:20 pm |
|
SSc7.2 Option 3CS-2009 SSc7.2: Heat island effect - roofposted by Markus Henning on Sep 28, 2011, 7:54 am
In my project I will achieve the requirements of SSc7.2 with option 3. The roof is covert by 10% green roof and 60% white gravel and ….. My question is if I don’t get the... Last reply: Susann Geithner, Oct 10, 2011, 2:00 pm |
|
What if there's no A/C.NC-2009 EAp2: Minimum Energy Performanceposted by Patana Rattananavathong on Oct 6, 2011, 11:21 pm
What if the project don't have any A/C? there are 3 retails, 1 wc. All are separated buildings. What should I do with ASHRAE 5.4, 6.4 and for energy simulation? Last reply: Marcus Sheffer, Oct 10, 2011, 12:09 pm |
|
LEED Project boundary and EAp2, EAc1NC-2009 EAp2: Minimum Energy Performanceposted by Kim Sosalla-Bahr on Oct 4, 2011, 12:22 pm
The project is a new facility, which has a new construction and renovation component. The new building is 6 stories tall, adjacent to an existing 3 story plus roof deck building. In our project... Last reply: Marcus Sheffer, Oct 10, 2011, 11:50 am |
|
STC Rating- ANSI S12.60-2010 exceptionsSchools-2009 IEQc9: Enhanced Acoustical Performanceposted by Rebecca Griffith on Oct 10, 2011, 9:40 am
This is a followup and additional question to my June 7, 2011 post. On 8/1/2011 a... Last reply: Rebecca Griffith, Oct 10, 2011, 11:31 am |
|
Occupancy for Physical Therapy Rooms for LEED for SchoolsSchools-2009 IEQc8.2: Daylight and views - viewsposted by Dana Murdoch on Oct 6, 2011, 10:16 am
I'm working on an early childhood education center that has a tenant that provides occupational and physical therapy to children on a one-hour appointment basis. Would these rooms be classified... Last reply: Susan Walter, Oct 10, 2011, 9:23 am |
|
designated smoking areasNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Annette Bellafiore on Mar 10, 2011, 2:30 pm
If you select the option that smoking is prohibited within 25' of the building, LEED Online asks you to indicate where smoking is allowed. Are they simply asking you to upload a site plan that... Last reply: Bethany Beers, Oct 7, 2011, 4:23 pm |