Topic | Recent |
---|---|
Square footage calculationCI-2009 IEQc8.1: Daylight and views - daylightposted by Michael E. Edmonds-Bauer on Nov 1, 2011, 3:56 pm
We have 4'' wide wall partitions between spaces. Should we include the floor surface occupied by the wall in the square footage calculation of a space? Considering that the wall area would never... Last reply: Emily Catacchio, Nov 1, 2011, 6:00 pm |
|
Modeling DOAS System efficienciesNC-2009 EAp2: Minimum Energy Performanceposted by Brandon Frey on Nov 1, 2011, 3:33 pm
I am modeling a geothermal heat pump system with a geothermal heat pump DOAS unit. The DOAS unit will be connected to the geothermal loop and will only provide 75 degree outside air to each heat... Last reply: Christopher Schaffner, Nov 1, 2011, 5:31 pm |
|
Residentail Diswashers and Commercial WashersPilot-Credits WEpc18: Appliance and process water use reductionposted by Eldis Goytisolo on Oct 31, 2011, 10:05 am
Where do I find the design flow rates for residentail diswashers and commercial washers? Last reply: Batya Metalitz, Nov 1, 2011, 4:23 pm |
|
Example L-16 NarrativeSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Heather Alley on Nov 1, 2011, 4:00 pm
Does anyone have a good example of an L-16 Narrative accepted by USGBC? This is our first LEED project, both architecturally and mechanically. The Example narrative under Documentation Toolkit... |
|
Student Clubs to Fulfill Requirements?Schools-2009 IDc3: The School as a Teaching Toolposted by Michael Kros on Nov 1, 2011, 2:29 pm
A project we are working on is considering implementing a student club program in order to fulfill the requirements for this credit. Perhaps the student club could formulate a program that... Last reply: Emily Catacchio, Nov 1, 2011, 3:36 pm |
|
Usage per Occupancy TypeNC-2009 WEp1: Water Use Reductionposted by Jean Marais on Nov 1, 2011, 10:21 am
Q1) Why is Part-Time and Full-Time occupants split? It gets calculated to... Last reply: Susan Walter, Nov 1, 2011, 3:25 pm |
|
Credit compliance for a building obstructed by another buildingNC-2009 IEQc8.2: Daylight and views - viewsposted by Udana Ratnayake on Oct 13, 2011, 2:19 am
We are working on a factory project where the building meets all the requirements stated in the LEED NC Guideline to prove credit compliance. but the building is right next to another building... Last reply: Emily Catacchio, Nov 1, 2011, 12:33 pm |
|
Target FinderNC-2009 EAp2: Minimum Energy Performanceposted by Guillermo T. Adamo on Oct 31, 2011, 6:57 pm
We are working on a fueling station located in Buenos Aires, Argentina. The form on leed on-line requires filling up the target finder in the Energy star website. The problem is that we are being... Last reply: Marcus Sheffer, Nov 1, 2011, 10:54 am |
|
Template inconsistency with GBCIEBOM-2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Planposted by Steve Offutt on Jan 11, 2011, 1:04 amin or register to post comments Jessica Hawley Sustainability Consultant LEEDuser Basic Member 62 thumbs up November 1, 2011- 10:48 am Thanks Jason. I also posted in another forum "LEED Reviews: LEED Online,... Last reply: Jessica Hawley, Nov 1, 2011, 10:48 am |
|
Tenant owned chiller with R-11?EBOM-2009 EAp3: Fundamental Refrigerant Managementposted by Chris Munn on Sep 29, 2011, 2:54 pm
I am working with a large building in New York. This building has a tenant that has their own chiller that utilizes R-11 refrigerant. Since the property team has no control over the tenants... Last reply: Jason Franken, Nov 1, 2011, 10:37 am |