Epoxy floor coatings
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Mathilda Jonsson on
Hello Does Epoxy floor go under Floor Coatings? It's hard to find epoxy with as low VOC-content as the requirement for floor coatings (100 g/l), tht's why I'm wondering.
Low Emitting Materials -Pushing the Industry forward to meet v.4
CI-v4 INc1:Innovationposted by Kerry Honsinger on
We are working on a LEED v.4 project. Regarding EQ Credit, Low Emitting Materials....
MRpc69 Attainable in the New Construction Project
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Vanessa Cardona on
This credit was readily attainable for a new residential building located in Manhattan. Six streams were recycled by tracking waste throughout the construction phase of the project.
ID credit Green Cleaning Policy without walk-off mats
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Rachel Bannon-Godfrey on
We have a project that is not achieving IEQc5 as walk-off mats conflict with the operational aspects of the building. Can we still apply for an ID credit for a green cleaning policy?
SCS not yet approved?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Erin Holdenried on
SCS certified EPDs are not yet approved?
SSc6.1 Design Storm Interval
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Curtis Dorosh on
Hi, I have noticed this question 2 times in the comments, but, I don't see an answer.
IEQc4.5 Uncertified Furnishings
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Emily Neal on
Hello, I'm a little confused with this credit. I've entered all the information that I have for the systems furniture that is Greenguard or ANSI certified. I have one piece that is not certified.
Determining Site Boundary on Renovations/Additions
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Andrew Buck on
We are working on a Hotel that is both a renovation and major new construction.
All controls provided using customised mobile app
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Yusuf Turab on
We are working on an IT office building that does not have any switches to control lighting.