Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

One building.

NC-2009 MPR5:Must comply with minimum occupancy rates
posted by  CT G  on 

We are currently working on a single office project for a corporate client.

1
Tue Jan 17, 2017, 9:48 pm

Master Site Credit

Pilot-Credits IPpc88:LEED O+M Starter Kit
posted by  Megan Recher  on 

We registered this with our Master Site for a high school campus plan in Texas. The site includes multiple existing buildings as well as two new construction buildings.

0

Non-LEED-Certifiable Buildings on Site

CS-2009 MPR3:Must use a reasonable site boundary
posted by  Krissy Buck Flickinger  on 

Hello everyone- I have basically two questions in one, regarding how to treat additional buildings on your site. Project Background: I have an 880,000 SF site.

0

Green-E Equivalency

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  David Ellner  on 

We have pursued EAc4, using a combination of on site and off site renewable energy sources. On site sources is not a problem.

1
Wed Mar 8, 2017, 11:49 pm

Energy Modeling for Design Sumittal

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear All:- we plan to submit a project in Design stage so please advise how to do energy model in design model what are the major changes in energy model between Design and Construction submission

1
Tue Aug 2, 2016, 3:14 pm

100% Owned

CI-2009 MRc1.1:Tenant Space—Long-Term Commitment
posted by  SW LEE  on 

Our project is 100% owned and doing 100,000sf interior refurbishment. No major alteration on HVAC nor the building core itself.

1
Mon Aug 15, 2016, 1:46 pm

Minimum of green area

NC-v4 WEp1:Outdoor water use reduction
posted by  Jose Antonio Kovacevic  on 

there is a minimum of green area (landscape) to comply with the outdoor water use reduction? in v3 I understand should be at least 5% of LEED Boundary.

1
Fri Aug 12, 2016, 9:29 pm

IEQ4.1 Aerosol Adhesives conversion

Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Kevin Taterus  on 

Using IEQc4.1 template version 4.0, in the notes under table IEQc4.1-1, the note #1 states "in the case of aerosol adhesives, the project team must provide a conversion of both the product VOC cont

1
Wed Oct 12, 2016, 3:11 pm

Commissioning of DATA Centers

Data-Centers-NC-v4 EAc1:Enhanced commissioning
posted by  Vassil Vassilev  on 

Greetings, There is a question from the Owner of Data center in respect of the forth comming commissioning process for his project. The question is related to the specific IT equipment and the spec

1
Tue Aug 29, 2017, 4:34 pm

Sustainable Agriculture and

EBOM-v4 MRc1:Purchasing - ongoing
posted by  Meier Corporate Account  on 

Is there a way, outside creating another pilot program, to update the spreadhseet for the Purchasing - Ongoing credit? 1. Food Alliance is no longer a viable entity.

1
Wed Aug 10, 2016, 9:55 pm