Forum quick links
One building.
NC-2009 MPR5:Must comply with minimum occupancy ratesposted by CT G on
We are currently working on a single office project for a corporate client.
Master Site Credit
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Megan Recher on
We registered this with our Master Site for a high school campus plan in Texas. The site includes multiple existing buildings as well as two new construction buildings.
Non-LEED-Certifiable Buildings on Site
CS-2009 MPR3:Must use a reasonable site boundaryposted by Krissy Buck Flickinger on
Hello everyone- I have basically two questions in one, regarding how to treat additional buildings on your site. Project Background: I have an 880,000 SF site.
Green-E Equivalency
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by David Ellner on
We have pursued EAc4, using a combination of on site and off site renewable energy sources. On site sources is not a problem.
Energy Modeling for Design Sumittal
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- we plan to submit a project in Design stage so please advise how to do energy model in design model what are the major changes in energy model between Design and Construction submission
100% Owned
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by SW LEE on
Our project is 100% owned and doing 100,000sf interior refurbishment. No major alteration on HVAC nor the building core itself.
Minimum of green area
NC-v4 WEp1:Outdoor water use reductionposted by Jose Antonio Kovacevic on
there is a minimum of green area (landscape) to comply with the outdoor water use reduction? in v3 I understand should be at least 5% of LEED Boundary.
IEQ4.1 Aerosol Adhesives conversion
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Kevin Taterus on
Using IEQc4.1 template version 4.0, in the notes under table IEQc4.1-1, the note #1 states "in the case of aerosol adhesives, the project team must provide a conversion of both the product VOC cont
Commissioning of DATA Centers
Data-Centers-NC-v4 EAc1:Enhanced commissioningposted by Vassil Vassilev on
Greetings, There is a question from the Owner of Data center in respect of the forth comming commissioning process for his project. The question is related to the specific IT equipment and the spec
Sustainable Agriculture and
EBOM-v4 MRc1:Purchasing - ongoingposted by Meier Corporate Account on
Is there a way, outside creating another pilot program, to update the spreadhseet for the Purchasing - Ongoing credit? 1. Food Alliance is no longer a viable entity.