Forum quick links
2 buildings = 100% = 5 points?
ND-v4 GIBc1:Certified green buildingsposted by Tommy Linstroth on
We are looking at doing 2 multi-family low-rise buildings. Each building would be LEED for Homes certified - so 100% of the floor area would be certified over 69 units.
n/a
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Anastasia Makarenko on
Our site is a renovation of a big confectionary factory.
Signage Comment
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Heather Holdridge on
I submitted for this credit for design preliminary phase review a few weeks ago.
Major renovation for NC and C&S
posted by OSCAR DE LA RED on
If there is not an exterior Work on envelope but there is a core MEP alteration ,could a project be certified as a NC LEED Project (or C&S)?
Appeal after final review
posted by Catharina B on
Hi Project is after final Design & Construction Review. GBCI denied few credits and we have 25 business days to appeal the results of the Final Review.
Recycling estimates from similar projects
CS-v4 MRp1:Storage and collection of recyclablesposted by Martin Stowell on
Since this is a C&S project, we need estimates for expected volume of recycling. Can you provide any guidance on where to find case studies or historical data or similar buildings?
90.1-2007 G3.1.1 exception d vs 90.1-2010 exception c
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Exception c requires that lab spaces use a system 5 or 7 in the same way that exception d does, but exception c does not prescribe any specific turn down during unoccupied periods.
Refurbishing of historic windows
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Kath Williams on
Windows in our historic building project have been removed, refurbished, glass upgraded to double-pane, low-e, etc. Can we use frames under MR c1 Building Reuse and MR c5 Regional Materials?
Occupancy Counts differ from workstation count significantly
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Vanessa Seibert on
I'm working on a 800,000 s.f. high rise building with 40 tenants.
Rainwater Harvesting for Toilet Flushing
NC-v4 WEp2:Indoor water use reductionposted by Patrice McVeigh on
Hello all, Can rainwater harvesting be used to reduce the indoor water consumption percentage?