Forum quick links
preserved for the life of the building?
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Erin Holdenried on
Is it required that habitat area be preserved for the life of the building (like open space in SSc5.2). The credit does not specfy this requirement.
Baseline Lighting Power density
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
Hi, Can you help with the following two issues: 1.I understand proposed total installed lighitng power has to be the same in the energy model and in SSc8.
Location of bicycle storage
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Dean Barone on
We have a situation where the footprint of the site is too small to accommodate all of the required bicycle racks serving our project in one area.
Rental Laundry Supplied Entrance Mats
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Charles Eichelberger on
I am new to Leed Requirements, and as my company manufactures walk-off mats, I am currently assisting one of our laundry rental customers in providing 10-ft, laundered entrance way walk-off mats to
ASHRAE 90.1 Add G table G3.1 baseline
CS-2009 EAc1:Optimize Energy Performanceposted by charles bell on
We have a building which is six stories. The first floor is retail, second thru fifth is office and sixth is residential. All are served from a virtual central plant.
EAC2 in a Positive Energy Building
NC-2009 EAc2:On-Site Renewable Energyposted by Milena Rafols Salvador on
We are certifying a Positive Energy Building, that will produce 130% of its energy consumption with solar PV. All the energy produced with the PV will be sold to the grid.
EAc5 Exemplary Performance
NC-2009 EAc5:Measurement and Verificationposted by Jodie Clarke on
The guidance for exemplary performance specifies the NC, CS and Schools rating systems. I would like to get credit for following Option 2 and 3 for Healthcare.
Retail FTEFull-time
CS-2009 WEp1:Water Use Reductionposted by James Wieben on
Retail FTE is for 8 hour shifts, so if the business has 12 hours open to the public do I use a value of 1.5 x the FTE value to arrive at a value to use when defining the usage of the plumbing fixtu
LEED for Home Multi-Family
Pilot-Credits PC38:Advanced Utility Trackingposted by Nate Gapinski on
Has anyone ever certified a multi-family construction project? Just wanted to see how the process was and if we are on top of everything.
Accessibility for Seniors
Pilot-Credits PC34:Design for Adaptabilityposted by Lance Hillegas on
Our project is an age and income restricted apartment building for low income seniors.