Forum quick links
Option 1 Zoning for a CI- Facility with out of scope areas withi
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Saju Varghese on
Good afternoon. We are currently submitting templates for a University facility.
Formaldehyde Emissions in Plywood Cabinets
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Andy Kallam on
I am currently considering submitting a plywood product for cabinetry that does contain Urea Formaldehyde adhesives.
Millwork as a whole vs. each piece
NC-2009 MRc7:Certified Woodposted by Caro Wilbanks on
We have been denied the MR7 point on a couple of jobs becuase of the millwork documentation.
Bonus point for the Regional Priority Credits
EBOM-2009 RPc1:Regional Priorityposted by Sundararaj Subburaman on
We browsed the USGBC website for Regional Priority Credits outside US in the following link: www.usgbc.org/DisplayPage.aspx?CMSPageID=2435 It is mentioned that earning up to four of the six credit
custom-made refrigerator for EBOM project
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Jorng-ren Chern on
I am working on EBOM for an old office building which includes an employee cafeteria.
1 Additional Bonus Point for earning all 4 RPCs
CI-2009 RPc1:Regional Priorityposted by Nandana Kumar on
Hi, I wanted to understand if it is possible to earn 1 additional bonus points, if the project has earned all 4 points under the RPCs. or is the interpretation of earning only a maximum 4 RPCs
School Campus Registration
posted by Ameet AA on
Hi I am working on a School Academy using the NC2009 for School & 2010 AGMBC guidelines. The campus consists of 5 main buildings and 1 FM building and1 Energy centre.
scope of materials
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Adam Targowski on
I would like to clarify what should be included in the calculations for this credit.
LUSTs discovered and remediated
CS-2009 SSc3:Brownfield Redevelopmentposted by charles bell on
Project is urban core multi-story mixed use CS. Leaking Underground Storage was discovered and remediated (including soil) and identification of water wells in the vicinity.
Requirement for CO2 sensor and OA measurement device
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Barbara McCrary on
I found a thread from 2011 discussing the Addendas released 5/9/11 removing the footnote that was previously changed under Addenda reliease 9/19/10.