Forum quick links
Adaptive Reuse
NC-2009 EAp2:Minimum Energy Performanceposted by Pat Thomas on
We are engaged in a high-rise adaptive reuse of a middle school built in 1934. Historic is requiring the original window assemblies be restored.
Level 1 audit
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Kay Sieck on
We are just completing our first in-house audit, I am still fairly new to LEED as an AP, would anyone be willing to share a completed Level one audit with me.
PI form 1 Assigning Mixed Use Acreage
posted by Carly Ruggieri on
The PIf1 table PIf1-2 is throwing me off. The only options for mixed use are to provide how many acres are assigned to residential and how many acres are assigned to non-residential.
PC5 still available?
Pilot-Credits PC5:Preliminary Integrative Project Planning & Designposted by Eeshoo Rehani on
Hello, Am I still allowed to submit PC5? I have a registration confirmation from Nov 2010 and survey completion confirmation in Sept 2011.
Adhesive for insulation instalation
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Joanna Bloniewska on
How would you qualify an adhesive for insulation instalation? I am not sure which VOC limit is the most appropriate.
M&V period for LEED 2009 C&S projects for EAc5.1 + EAc5.2
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Philip Herriges on
The LEED reference guide is very particular in the language that they use to describe the intent and stragegies for EAc5.1 and 5.2 for C&S as being distinct from NC & Schools. For NC&
Furniture included?
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by severine secret on
Using LEED NC 2009, do we need to include furniture items, such as workstations, task chairs and their related components as required for IEQ.45 in LEED CI requirements?
Two Year HVAC Electricity Use
CI-2009 EAc4:Green Powerposted by Joseph Greene on
Our LEED project occupies 30% of the total building floor area. The energy model modeled the entire building due to a central boiler and condenser water plant.
sanitary installations within tenant fit-out
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Michael Haugeneder on
Hello all, Our current core&shell project does not include sanitary installations, which will only be built at tenant fit-out stage.
certification boundary
posted by Michael Haugeneder on
Hello, I would like to ask some questions about the certification boundary. 1. A project of mixed use (retail+offices and hotel) is being certificated within 5 floors.