Forum quick links
User Education Plan
Schools-2009 IDc1:Innovation in Designposted by Lauren Fakhoury on
Can you still pursue and ID credit for user education if you are not pursuing IDc3, school as a teaching tool?
ID Credits (LEED 2009 - V2)
NC-2009 IDc1:Innovation in Designposted by Prashant Kulkarni on
LEED Online allows to submit 4 + 1 credits. Can we submit more than 4 ID credits just to be on the safer side so that we may get all 4 points? If yes, how do we add them on LEED Online?
compliance for rentals spaces in LEED-NC
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by MAUDE PINTAL on
I can not find any instruction for tenant space that are provided without any layout.
Multiple types of medical office
NC-2009 SSc2:Development Density and Community Connectivityposted by Maura Adams on
My review team said that four of my ten basic services were medical offices and that I could only count that service once.
Equation 3 Help
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Sam Watters on
I see that equation 3 in the reference manual performs the calculation for Q, the peak runoff rate, but I do not see how this value is used to calculate the amount of water retained on site. How d
Automatic Lighting Shutoff for tenant spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
Do tenant spaces need to be included in the areas controlled by the automatic shutoff as mentiaoned in section 9.4.1.1 (ASHRAE 90.1)?
U-value unheated/heated slab-on-grade floor
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
Hello. In the building which I’m modeling there is an underground floor whose slab-on-grade floor can be considered as divided in three parts: one part (wellness) is heated with heated floor, anoth
Two on/off switches for multi-occupant space
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by SON NGUYEN VAN on
Our building had two types of power source, one is normal power, one is essential power (back up by genset) and also supply two kind of power for lighting system.
V4 or V3 forms for 2009 Core and Shell...
posted by shashank jain on
Hi we started the project with the Core and Shell... and we saw that the LEED has released V4 forms on the LEED online.. we should be using the V3 (the lEED that we were referring to) or V4...
Blower Door Test Required?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Wei Jiang on
We have a high-rise hotel project with all guest rooms in the tower and hotel facalities (restaurants, meeting rooms, gym, etc.) in the podium.