Forum quick links
video overview of proposed LEED 2012 changes
posted by Tristan Roberts on
LEEDuser has uploaded an hour-long video overview of key changes proposed for LEED 2012 for NC and EBOM ratin
Window to wall ratio
NC-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
I’m working on project with two mid-rise buildings, one for the office and the other is for parking garage mostly are naturally ventilated.
Problems with ID&C
posted by Melissa Wrolstad on
The ID&C system is full of problems where credits have not been translated correctly from BD&C.
'installed by substantial completion of construction'
Schools-2009 EAc2:On-Site Renewable Energyposted by Sara Goenner Curlee on
The letter template has a sign-off for the owner/agent to declare that the renewable energy source (in my case PV solar thermal) is 'installed by substantial completion of construction.' We will be
What is the current definition of Alternative Fuel Vehicles?
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Elizabeth Durney on
Does it include flexfuel cars?
MR3 Materials Reuse and MR4 Recycled Content - "Double Dipping"
CI-2009 MRc4:Recycled Contentposted by Studio 804 on
Did … did you just double-dip that chip?..... I'm working on a project that emphasizes the use of reclaimed materials and materials with recycled content and have come across a few items for which
melamine-urea-formaldehyde (MUF)?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Ward Miller on
Does anyone have experience or know whether GBCI accepts MDF with melamine-urea-formaldehyde (MUF) in it for IEQc4.4?
LEED BD+C Major Renovation or LEED EBOM
posted by Stéphane Paris on
I have a project to certify in France, this is an existing building which will be occupied during the work. The functionality of the building will be change for approximately 60% of the building.
official commenting closed here
posted by Tristan Roberts on
With USGBC's comment period closing in 12 hours, LEEDuser must close this forum as of now as an officlal place to comment.
official commenting closed here
posted by Tristan Roberts on
With USGBC's comment period closing in 12 hours, LEEDuser must close this forum as of now as an officlal place to comment.