Naming Convention - Options/Compliance Paths
posted by Jessica McNaughton on
I find the naming convention of "option 1, option 2 etc" confusing in light of the fact that these are not really options or alternative ways of achieving a single credit, but rather can be combine
Zone Air Distribution Effectiveness
CS-2009 IEQp1:Minimum IAQ Performanceposted by Noriko Nagazumi on
Let me confirm the following ASHRAE 62.1-2007 Zone Air Distribution Effectiveness (Ez) issue. Our project utilizes total heat exchangers for ventilation.
Baseline in LEED reference guide and IPMVP
NC-2009 EAc5:Measurement and Verificationposted by Karoline Geneser on
Considering EAc5, both LEED Reference Guide and IPMVP use the term “Baseline”.
Commissioning existing energy systes
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Ken Dooley on
We have building renovation that is refurbishing 80% of a building aiming for CS 2009.
Achieving IEQp1 with no ventilation systems for C&S project
CS-2009 IEQp1:Minimum IAQ Performanceposted by Tony Schafer on
I’m wondering about how to comply with this credit for a C&S building that, upon initial completion, will be just a big warehouse space with no ventilation and the only HVAC equipment will be u
Space Usage Type - Table
posted by Gail Vittori on
Can anyone clarify if the column "Regularly Occupied Area" should correlate with "Regularly Occupied Spaces" as defined in EQc8: Views and Daylighting or should it be all occupy able space?
Retail Space inside a Shopping Center
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Sustentator Argentina on
We are looking to certify a retail space inside a huge shopping center under Commercial Interiors (not as Retail Commercial Interior, the shopping is NOT certified) We are considering that our shop
Achieving C&S certification with no ventilation or FTEs
posted by Tony Schafer on
I'm wondering about LEED certification for a C&S building that will have no ventilation and will have no FTEs upon initial completion.
LEED EB or LEED NC?
posted by Marcio Alberto Casado Pereira on
Is there any percentage limit above which an existing building that is undergoing a renovation is considered a New Construction?
facade lighting savings
CS-2009 EAc1:Optimize Energy Performanceposted by Puteri Shireen Jahnkassim on
Dear Marcus We conducted an energy simulation analysis and included Facade lighting as one of the energy saving features.