Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Contradiction for Pressurized Hallways

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Omer Moltay  on 

Some sources (including LEED User) suggest that hallways pressurized with mechanical ventilation can be used to ventilate spaces in dwelling units that are adjacent to the unit entry door through i

0

Natural Stone Flooring need FloorScore Certificate?

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Caroline Ma  on 

Do we need to find the natural stone flooring e.g. marble, granite with FloorScore Certificate? Or we can simply use natural stone flooring without any certificate to score for this credit?

1
Tue Feb 28, 2012, 2:19 am

Temporary construction material left on-site.

NC-2009 MRc2:Construction Waste Management
posted by  Keith Robertson  on 

Should MRc2 include temporary construction materials that are left on-site. In particular, it is common for a crane-base, or temporary concrete dead-men or casting beds to be left on-site.

1
Fri Apr 6, 2012, 6:00 pm

Areas to be considered

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Angela Saggin  on 

Hi! What areas/rooms should we consider inside an appartment for the calculation of naturally ventilated spaces?

0

Sauna

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jim Park  on 

I am working on a hotel project, which would use standard fixtures (no high-efficiency fixtures), but would still earn 2 points under WEc2, and 2 points under WEc3 due to utilizing recycled gray wa

1
Fri Apr 6, 2012, 5:19 pm

LEED NC - Tenant Commissioning

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Jennifer Preston  on 

Our base building will be fully commissioning, but the small first floor tenant fit out is not in the scope of the project, beyond providing base building systems.

1
Fri Apr 6, 2012, 6:48 pm

Option 1 and Option 2 Combined?

EBOM-2009 SSc7.1:Heat Island Reduction—Nonroof
posted by  Jason McIntyre  on 

I have a project that has a detached parking garage, of which has spaces on the top level (uncovered). I also have surface parking spaces on the site...

1
Thu Apr 5, 2012, 2:06 pm

EAp1 Review Comments

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  matthew strong  on 

We recently received review comments asking us to list energy demand savings and maintenance cost savings for our EEMs.

1
Mon Mar 19, 2012, 6:35 pm

Upgrading Older Models

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Curt Pascoe  on 

Has anyone completed the credit template in LOv3 recently? The form no longer refers to "upgrades" per the LEEDuser calculator or the Reference Guide Calculations.

0

I also agree the HTA index

Pilot-Credits PC29:Housing and Jobs Proximity
posted by  Evelyn Smith  on 

I also agree the HTA index was extremely user friendly. Our LEED for Homes project was easily able to use this credit as we are located in Washington, D.C. and centrally located near jobs.

0