Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Existing System with New Chiller Plant

NC-2009 EAp2:Minimum Energy Performance
posted by  Ante Vulin  on 

Our project is an existing 36,000 sf museum with a planned 18,000 sf addition. The existing portion is served by a dual-duct HVAC system with a boiler and chiller plant.

1
Wed Feb 22, 2012, 4:18 pm

Walk-off mat system - Stone panels with a recess below.

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  myriam tschiptschin  on 

The project team of an office building is interested in using a new product called C/S Floorometry® 401 for the walk off mat: http: //www.c-sgroup.com/files/literature/Floorometry_0.pdf This is a f

1
Sat Sep 1, 2012, 7:52 pm

LEED CS ID Path 1 - Legally binding performance criteria

CS-2009 IDc1:Innovation in Design
posted by  Caroline Ma  on 

In our CS project, we would like to develop a legally binding performance criteria for the tenant to attempt 1 point in ID Path 1.

1
Thu Apr 5, 2012, 2:45 pm

Treatment of District or Campus Thermal Energy and EAp2-7 tables

NC-2009 EAp2:Minimum Energy Performance
posted by  AAME User  on 

Our project involves the new construction of a healthcare clinic that is being heated and cooled via heating and chilled water produced by a campus central plant.

1
Thu Feb 23, 2012, 10:33 pm

How to determine the building foorprint?

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Gabriela Hernández Castillo  on 

Our project is a building that literally crosses another building. It consists of a 40 stories building (the LEED building) that comes out of a 3 stories mall (not applying for certification.

1
Thu Apr 5, 2012, 2:40 pm

Flooring Systems Tracking Form

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Ara Massey  on 

The "Sample Letter to the Contractor" included in the Documentation Toolkit references a "Flooring Systems Tracking Form" yet I cannot find one included in the toolkit. Is this available?

0

Calculations

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Angela Saggin  on 

Hi! I'm having some difficulties with the calculations, specially with the meaning of each variable in each equation. In equation 1, the 'P' (average rainfall event), should we consider the year

1
Fri Aug 31, 2012, 10:21 pm

Green roof in terrace covering parking lot

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Marcio Alberto Casado Pereira  on 

My project has a parking lot on the underground, groundfloor and also on the 1st pavement of the building (7stories high).

1
Fri Apr 6, 2012, 2:56 pm

Outdoor Amphitheater

LEED Rating System Selection
posted by  Keelan Kaiser  on 

We are working on a project with 4000 seat outdoor, but covered, amphitheater with a 20,000 s.f. back of house/administrative building.

1
Wed Sep 5, 2012, 8:47 pm

Future Tenant Improvements in a LEED NC Project

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  James Del Monaco  on 

I have a Student Union project which has spaces ranging from offices to classrooms to theatres.

1
Wed Mar 28, 2012, 5:27 pm