Forum quick links
Occupancy Sensor definition
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by CRB Sustainability on
I am not seeing a definition for an occupancy sensor in the 2009 CI reference guide.
Review comment asked for extracted etc.
Schools-2009 MRc5:Regional Materialsposted by Suzanne Allerton on
We recieved a list of materials that the reviewer asked for distance for the extraction.
Bike racks for Sports Arena
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Fc P on
Hi, we are working on two Football Stadiums for the next WorldCup. Both are located in dense areas with easy access by bicycle, so pursuing this credit seems like a reasonable intent.
Integral color and LEED concrete tracking form
NC-2009 MRc4:Recycled Contentposted by Wendelyn Bone on
I have documentation from the project's concrete supplier that includes integral color together with cementitious materials.
On Site Solar Power
EBOM-2009 EAc1:Optimize Energy Performanceposted by Julia Weatherby on
Energy Star Portfolio Manager requires that power produced and used on site be included when submitting for an Energy Star rating.
paints for steel door
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Adi Negara, LEED AP BD+C on
where do these kind of paints fall under the Product Type of Table 1. IEQc4.2 Applicable VOC Limits ?
Late implementation no.2
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Anna Korinkova on
Hello all, I have another question regarding late implementation of the EPA’s requirements. Our project is a shopping mall in Prague, Czech Republic.
Underground parking ramp
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Anna Korinkova on
Is it possible to use a ramp leading to an underground parking as an entrance for bicycles as well?
Rainwater Harvesting
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Udana Ratnayake on
Our project is harvesting and reusing rainwater for flushing. rainwater that falls on the roof is collected in a 10cubic meter sump.
Completing Enhanced Cx Templates for Federal Projects
NC-2009 EAc3:Enhanced Commissioningposted by Hsin-Yi Hsieh on
Many federal projects are design/build (DB) where the DB firm hires the Commissioning Authority (CxA).