Forum quick links
Should be good to go
posted by Candace Small on
I recently went through the BD&C eligibiliy requirements for a coworker and the latest pdf (http://www.gbci.org/main-nav/professional-credentials/resources/candidate-handbooks.aspx) says "Thi
Active Design- LEED ID credit Physical Activity- LEED NC & CI
CI-2009 IDc1:Innovation in Designposted by Baani Singh on
You can earn a LEED ID credit by promoting Physical activity in your building. Most of the strategies are already in LEED CI& NC.
Questions about multiple buildings certification (small complex)
posted by Camelot Colindres on
Hello everyone, I am new in the simulation of LEED proyects. I want know if any can help me to answering a doubt.
Red Alert on Equipment Metric Review Trend
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Jenny Carney on
All, we've seen a trend from the review side that we want to share so that folks can be prepared.
Medical Equipment: Pilot Credit, LEED Point, Incentive Programs?
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by Catherine Pana on
I work for GE Healthcare and we recently introduced a new CT (Cat-Scan) Scanner to the market that is 60% more electrically efficient.
Gender Ratio Impact on WE p1 and c3 Water Calculations
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by J Douglas Dietrich on
We understand from experimenting with the forms that the results are influenced by the male to female ratio. Are all projects required to use a 50:50 ratio?
Pilot Credit #45
Pilot-Credits SSpc45:Site assessmentposted by Jill DeMarotta on
I think this is a good credit.
Synthetic turf roofs?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Nelina Loiselle on
Would a "green" roof done with synthetic turf apply to this credit under the green roofing option?
Determining Baseline System Type
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Rebekah Burke on
I am trying to correctly determine the baseline system for my LEED energy model. I have a 7-story hotel building so it will either be System 1- PTAC or System 2 –PTHP based on ASHRAE 90.1-2007.