Forum quick links
entryway systems for hospitals
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Dario Ibarguengoitia on
Does anybody know wich option (roll out mats or permanent entryway systems ) is more efficient/clean for an hospital?
VOC Limit for Insulation Anchor Adhesive?
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Beth Mosall on
I have had someone submit Midwest Fasteners IHA-170 Insulation Anchor Adhesive to me. It has a VOC content of 405g/L, which is high. What category does this type of adhesive fall under?
Renovated parking for another entity - part of parking total?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Renee Shirey on
We have a project where we are accessing our site by cutting through an existing parking lot that belongs to the city (and supports the use of a city-owned pool).
Future Contract for SSc5
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Frederick Freeman on
We are currently pursuing EBOM for a small campus of buildings and are interested in the off-site option and our company owns a large plot of land that will be redeveloped into a new building with
late submission
posted by Tristan Roberts on
Sam, the risks I see are that 1) documentation completed after the fact has the potential to run into problems if you haven't kept track of key data or paperwork.
How to use AGMBC 2005
posted by Sanghong Han on
Hi. I'm LEED AP but don't have experience for LEED certifications. This is my first time. I'm working on LEED certification for US army project.
How to model chiller for only one wing of an existing building
NC-2009 EAc1:Optimize Energy Performanceposted by Allison McSherry on
I am currently working on a LEED v3.0 model in trace 700. It is a historic building originally built in the late 1800s. It has a variety of unique situations that I am unsure of how to model.
LEED Retail/NC/Core Shell?
posted by G B on
Hello all, I am working on 500,000 sqf shopping mall that is to be LEED certified. The question is shall we pursue LEED Retail, or LEED NC or LEED Core and Shell?
Open space below the building
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ramón Gutiérrez on
Hello from Spain, Our ground floor is smaller than our building footprint.
CEE Tier III ratings in washers
Pilot-Credits WEpc18:Appliance and process water use reductionposted by Chris Miller on
The Consortium for Energy Efficiency (CEE) updated their list of models that are compliant for the varioius CEE Tier ratings. The website had great information on other appliances too.