Forum quick links
HC Addenda issued
posted by Susan Walter on
The USGBC has issued an Addenda for Healthcare: http://www.usgbc.org/DisplayPage.aspx?CMSPageID=2200#BD+C . Here's hoping the link works.
LEED Project Boundary - LEED NCv2.2
posted by Jennifer Turchin on
We have a hotel project that is 23 stories and was started and registered as a LEED NCv2.2 project in 2008.
Blower door test form
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Stefania Minotti on
Hi, does anyone know where I can find the ‘’Certificate of Field Verification and Diagnostic Testing’’ that needs to be filled out for each blower door test that is performed, as indicated in ‘’4
Exterior Lighting - LPD
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Simon Sue on
We have a retail banking project. the building is 2 stories high + a roof top and was renovated. We installed a roof garden on it. we also install light fixture surrounding the roof garden.
Existing shower facilities used for previous LEED certification
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Sharlene Angeles on
Our project site has a sufficient changing/shower facility that is existing in another building that also achieved LEED certification, including this point.
EBOM IEQp1: Dedicated OA to classroom FCU's
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by James Doyle on
For EBOM IEQp1 we have a school using a dedicated ventilation AHU providing ventilation air to classroom FCU's.
LEED for Homes overseas!
posted by Maged Samy on
i have a client who is intrested in LEED home for his Signle Family development, about 300 signle family home, in Saudi Arabia any experiance, to share...
Cooling Tower for Back-up Diesel Generators (DG)
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Anshul Chawla on
The project site has 3 cooling towers of 215 ton capacity each. These cooling towers serve the HVAC system of the building and are operational for 8-10 hrs on all working days.
VRP Compliance Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Juliana Malho on
We have a CI project with multiple zone units and VAV system. We are using template VRP compliance calculator.
Technical Rooms
CI-2009 IEQp1:Minimum IAQ Performanceposted by Juliana Malho on
Does technical rooms, as IDFs rooms needs to have outside air renovation?