Forum quick links
Long Term Commitment
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Tiago e Silva on
I got I bit confused with the period of time which is considered to comply with the aim of this credit. At first a thought the 10 year commitment counted from the date of the LEED certification pr
FTE for Schools
Schools-2009 WEc3:Water Use Reductionposted by David Mirabile on
When calculating the FTE's, what is typically done for summer months when school is not is session?
LEED Pressure Adjustment for Lab HVAC-Systems
CS-2009 EAc1:Optimize Energy Performanceposted by heinrich post on
Seems that some of my questions are not easy to answer. Here is another question for the same lab project. Fan system Power limitations are calculated according to Table 6.5.3.1.1A of ASHRAE 90.1-
hardfill
Schools-2009 MRc2:Construction Waste Managementposted by Eri Spaulding on
In one of our projects, most of the construction waste (especifically concrete and masonry) has been used as hardfill in land outside this project, in a location where other construction will take
2 phases building
posted by Roger Moquin on
My case is almost similar of the "U" building of Roberto Meza, but we dont want to certify the second phase.
Exterior Wall Defintion for EA Credits
NC-2009 EAp2:Minimum Energy Performanceposted by Miranda Gardiner on
I have a general code question regarding when a wall is considered interior and when it is considered exterior, as our team has looked for clear language in the NYS energy code as well as the ASHRA
EA 6.1 Good HVAC Design and Installation
posted by Ricky Li on
There is a note stating that "Homes with no heating must follow the performance approach (e.g. EA1), and may not use the prescriptive pathway".
Cost to be Excluded in the total proj material costs for MR CR3
NC-2009 MRc3:Materials Reuseposted by Benjie Herrera on
I just want to inquire if we will include HVAC equipment, PV arrays, Solar hotwater collectors, generator, fire alarm control panels, etc.
Ventilation for storage an mechanical rooms
Schools-2009 IEQp1:Minimum IAQ Performanceposted by Rodrigo Ubilla on
Dear experts, We are working on a university building wich has 2 underground floors, with mechanical and storage rooms in them, all these rooms are adjacent to the stairs.
Pilot Credit Content?
Pilot-Credits EQpc22:Interior lighting - qualityposted by Jonathan Weiss on
The content listed here on this page differs from the current content on the USGBC website - they have a similar but different set of requirements listed. Which one is currect?