Master Plan vs. LEED Project Boundary
Schools-2009 SSc9:Site Master Planposted by Dana Murdoch on
Does the master plan need to be the same as the LEED Project Boundary? We have a project where the public school district is adding a building to their existing 'junior high campus'.
Option 1 - Retain evidence of communication...?
Schools-2009 SSc10:Joint Use of Facilitiesposted by Dana Murdoch on
In option 1, what does 'retain evidence of communication used to notify the public of shared space availability' mean? Do we need to have a sign?
Playgrounds
Schools-2009 SSc10:Joint Use of Facilitiesposted by Dana Murdoch on
Would playgrounds be considered available for shared use in the community? They don't list playgounds, but they do list playing fields.
IEQ 1.1 - Pest management emergency case
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Hatice G. on
Dear all, we´re currently working on a certification of highrise office building. In our revised pest management policy we should state which emergency case condition has to occure that pesticides
light controls for exam rooms
posted by Susan Walter on
Elizabeth, The light controls are typically for workers and include patients when they will be there for a long time.
LEED Healthcare Forum
posted by Susan Walter on
Tristan, What are the plans to have LEED HC have its own forum like the other programs?
Fire Caulk
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Lu Anne Nielsen on
Does fire caulk fall under "other sealants"?
AREA CRITERIA
CS-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ DIAZ on
HI, I HAVE A PROJECT IN MEXICO CITY, AND THE OWNER DEFINE THE CRITERIA OF DONT USE TREATMENT PLANT AND USE AIR COOLED CHILLERS.
Entrance lobby as live-work space
Pilot-Credits PC14:Walkable Streetsposted by Jens Apel on
In my project there is a main entrance lobby that includes a permanently manned reception.
Sidewalk definition
Pilot-Credits PC14:Walkable Streetsposted by Jens Apel on
How would the sidewalk length for the category "Sidewalk Intrusions" be measured for a project consisting of several buildings on a plaza. There are no defined sidewalks and nor driveways on the pl