Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Roof Terraces and Balconies

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Catalina A  on 

We are certifying a Hotel Project earning credit SSc2.

1
Fri Oct 21, 2011, 11:02 pm

IEQ credits

General forums
posted by  Tristan Roberts  on 

Gavin, yes, those credits apply to the whole building.

0

project admin duties

General forums
posted by  Tristan Roberts  on 

Matt, sorry for the slow reply on the forum here, but it seems like you have things well in hand. Your unerstanding of the reviews seems correct. Do you have any current questions?

0

contacting reviewer

General forums
posted by  Tristan Roberts  on 

Sangeetha, you can also call GBCI with the number on their website. They are often responsive to phone calls.

0

Comparing Process Pumping between Baseline and Proposed

NC-2009 EAc1:Optimize Energy Performance
posted by  Evelyn Dicks, EI, CxA  on 

I am working on a lab building near the coast where seawater is pumped into the building for use by researchers.

1
Thu Sep 8, 2011, 3:00 pm

Modeling PCW Heat Rejection for DES vs. System 5 (DX Cooling)

NC-2009 EAc1:Optimize Energy Performance
posted by  Evelyn Dicks, EI, CxA  on 

I am working on a building that supplies process cooling water (PCW) to lab spaces. The PCW rejects its heat through a heat exchanger to the chilled water system from a district energy plant.

1
Thu Sep 8, 2011, 2:54 pm

vestibule instead of pressure difference

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Nándor Kovács  on 

I found in ASHRAE 62.1-2004 standard that using a vestibule to provide airlock between garage and regulary occupied spaces is a compilant way to limit the entry of exhaust gases. Is it possible to

1
Mon Nov 21, 2011, 6:05 am

LEED Project Boundary, Existing Irrigation, and Crane Placement

NC-2009 WEc1:Water Efficient Landscaping
posted by  Brooks Critchfield  on 

We have a project on an existing campus which requires that two large cranes sit next to the project on an adjacent turf area.

1
Thu Aug 11, 2011, 5:14 pm

Exhaust Rate of at least 0.5cfm/sq.ft

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Maya Karkour  on 

Hi All, Assuming that one of the hazardous chemical area also has a fresh air supply (in addition to the exhaust), how do we determine if the min exhaust rate (0.5cfm/sq.ft) is achieved.

1
Tue Oct 18, 2011, 10:29 pm

LEED for Homes - outside the USA ?

LEED for Homes (LEED-H) Forum
posted by  Mike Barker  on 

The usual question from the international market ? How do we rate houses outside continental USA ? Could we make use of a LEED for Home AP who works in the USA ?

1
Sat Dec 29, 2012, 1:51 am