why do we need to model heating if we have none
NC-2009 EAp2:Minimum Energy Performanceposted by Alicia Villanueva on
I am working in projects in Mexico and it has been a challenge to model heating when we have none. Sometime when modeling heating comes out higher in the proposed design than in the baseline and t
LEED registered projects
posted by Tristan Roberts on
Ed, USGBC maintains a database of registered LEED projects.
How many CO2 sensors are required per space?
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by William Wong on
Credit requires to monitor CO2 level for densely occupied spaces. Is there any requirements for the minimum no. of sensors per space / sq ft?
calculation assumptions
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Susan Walter on
Now that we're digging into the credit, we have questions on the assumed thickness for items that are a SF input.
LEED for Homes - MR 2.2
posted by Natalie Connor on
This is my first time working on a LEED project for a residential construction company and I'm trying to finish up the final paperwork (basically the MR 2.2 section).
Green Advantage Innovation Credit for 2009 BD&C & NC v2.2
NC-2009 IDc1:Innovation in Designposted by liz boastfield on
Projects staffed with 30% or more of key personnel certified through Green Advantage are now eligible for award of 1 Innovation point.
Total Cost of Materials
NC-2009 MRc4:Recycled Contentposted by J Morrison on
The LEED Online format for submitting the MR credit 4, 5, and 7 it asks for the "Cost per Item" and "Number of Items Purchased". I have to total cost of the items, but not the individual cost.
Energy Modeling
CS-2009 EAp2:Minimum Energy Performanceposted by Yolanda Sanchez on
In a LEED CS 2009 building energy simulation we are modeling the building envelope to test performance (only the building envelope).
HVAC System
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Yolanda Sanchez on
HVAC for the whole building is in the process of being designed (VRF system).
Earning Certs within 5 years
posted by Barry Giles on
I presume that this is a new construction project that is currently in the process of design and will be built with a possible completion date of 5 years hence...or more.