Forum quick links
Construction dates of bicycle networks
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Carrie Johansen on
It seems like this information may not be readily available for many bicycle networks. Has anyone else had difficulty finding information regarding bicycle network construction dates?
Building Envelope Requirements for Continuous Insulation
NC-2009 EAc1:Optimize Energy Performanceposted by Myra Villalobos on
We have a project that has structural masonry walls, and interior steel studs. Appendix G requires 7.5 c.i. for our walls, so I have two questions: 1.
Consider footnoting Table of Required Signatories in LOv3
posted by RETIRED on
I think Owner Required Signatories is a great addition for many of the prerequisites and credits where it is used. It has been a breath of fresh air to get owners on board with the requirements.
Absorption Chiller - District Heating
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Ralf Lehmann on
In my project there is an absorption chiller supplied by district heating. The building itself is also heated by district heating.
More LCA Score Questions
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Dirk Kestner on
Were Laura’s questions from April 7th ever resolved? I just input some data for a new project and am also getting a score over 100.
How to document glare control w/ prescriptive method?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Bonnie Chiu on
I am documenting all the rooms in the building using the prescriptive method and I've checked the box that says 'the project has incorporated appropriate glare control devices...' in the credit for
Ground-Mounted Solar PV Arrays
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by J Douglas Dietrich on
If there is an open space with (1) a ground-mounted solar PV array and (2)native plantings or adapted vegetation beneath the PV panels and around them so as not to block sunlight, would the area be
Vendor Letter Sample/Template?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Elliot Powers, LEED AP BD+C on
I may be mistaken, but I thought I saw in the Doc Toolkit some time ago that there was a template/sample available to send to vendors from whom our client makes purchases, and which would assist in
ARI Certification Requirement
NC-2009 EAp2:Minimum Energy Performanceposted by Udana Ratnayake on
We are working on a project in Sri Lanka where water cooled package units are to be used for air conditioning.
Case 2 Site with little decrease in Impervious Ratios
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by ryan mclean on
I am in the processing of accessing the feasibility of attaining this credit with a site that is currently 88% impervious and the proposed site is roughly 81% impervious.