Daily Average Building Occupants for WEc3

Calculating FTEs
posted by  David Mirabile  on 

How would you calculate your Daily Average Occupancy (for transients)?

1
Wed Jun 8, 2011, 3:19 pm

Common services

General forums
posted by  javier bolanos zeledon  on 

This is a retrofit of an existing office building within a medium manufacturing company. The office building is about 5000sq ft and the overall facility about 100 000sq ft.

1
Wed Jun 8, 2011, 3:20 am

Gravel Coeffecients

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Steve Walker  on 

I have 3 parking lots which are comprised of gravel (chat)....what would the coefficient for this be? I believe it should be less than any kind of pavement but more than grass.

1
Fri Sep 2, 2011, 3:13 am

Equation 1 Interpretation

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Austin Evans  on 

In the Volume Captured equation the variable "I" is said to stand for percent impervious of surface. Is this the same thing as the coefficients or is this different?

1
Tue Nov 22, 2011, 4:33 pm

Portfolio Manager for Dormitories

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  JOHN COOK  on 

We have an 180,000 sf dormitory and trying to get an ENERGY STAR rating through Portfolio Manager.

1
Wed Jun 8, 2011, 4:57 pm

Typical Design CO2 Level

CS-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Maya Karkour  on 

Dear all, I understand that LEED doesn't require you to specify a maximum CO2 level for this credit.

1
Wed Jun 8, 2011, 5:18 pm

Recycling Area - Exterior

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Mark Pappas  on 

We are working on a retail/office CS project (2.0) and are looking at placing the recycling outside adjacent to the dumpster area, as the interior common areas don't accommodate all tenants very we

1
Wed Jun 8, 2011, 9:11 pm

IEQ3.2 IAQ MANAGEMENT PLAN - OPTION 2

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Jérôme Aruanno  on 

Hi, I am questioning about the second option, mesuring the contaminant levels. The table p 462 is indicating level to respect.

1
Tue Jun 28, 2011, 10:17 am

EBOM IO 2009 - SS cr 8

EBOM-2009 IOc1:Innovation in Operations
posted by  Salvatore Benvenga  on 

1. SS cr 8 - would the addition of timers and sensors for internal light fixtures in multiple zones qualify as an IO point?

1
Wed Jun 8, 2011, 6:22 pm

ACP

General forums
posted by  Tristan Roberts  on 

Michael, you should not find that either of those checkboxes are required. You can sail by those areas if they don't apply to your project.

0