Forum quick links
Tenant Infill within a Parking Garage
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Jon Texter on
Our Project is a restaurant taking up less than 75% of a parking garage. We are going for SSc3.3 Case 1 Option 1. Our lease provides us with access to two parking spaces.
Building footprint
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Albert Tappe on
Our project is an office tower connected to a large 4 level car park with a public plaza on top and retail at the perimeter on ground level.
Faucet Aerators use
CS-2009 WEp1:Water Use Reductionposted by Alessio Zampaglione on
Can someone confirm me that the use of faucet aerators is an allowed way to achieve WEp1 WE c3 for Leed CS v3 ? It's impossible to find a faucet with a so low flow rate in italy.
Annual building energy determination
Schools-2009 EAc2:On-Site Renewable Energyposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
Does this credit require the sum of ALL energy uses (electricity, gas, etc.) for the proposed building be the basis for determining the renewable energy percentage or is it just the electricity use
MPR #6 Water Data for a private well
posted by Kendal Neitzke on
How do we report water data when a project building is served by a private well? Do we need to install a water meter and submit water data manually? Our project is a LEED 2009 NC.
RP Credit Without a Threshold/Path
EBOM-2009 RPc1:Regional Priorityposted by Phillip Saieg on
The list of RP Credits for our project (zip code 80202) includes SSc6.
green power - purchased percentage
CI-2009 EAc4:Green Powerposted by Andy Plogsted on
Our client owns the building and occupies 50% of the square footage of a singularly metered building. The owner (our client) signed a contract to purchase green power for 30% of the total building
Bed Formatting
posted by Jason Chenard, PE on
Sorry for the bad formatting. It did not show on the preview, and I can not edit after submission, apparently. Blame MS Word. -Jason
Off Site Parking
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Jeff Mosher on
Can one acheive this credit via compliance path B. (no parking) if the facility has no on-site parking, but does have an off-site parking lot with a shuttle service?
Residential Units with Natural Ventilation
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Sustainability Provider on
Hello, I have two questions: 1) We have a residential multi-unit project with approximately 100 units. All the individual units are naturally ventilated with openable windows. (ie.