Forum quick links
Prescriptive Method: skylight zones?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Kash Boodjeh on
Hello, We are pursuing the Prescriptive Method for this credit, using both skylights and windows.
ID Catalog and precendence
Schools-2009 IDc1:Innovation in Designposted by Lisa Logan on
Below is a response I received from a reviewer concerning a credit I took directly from the ID catalog which indicated that the credit along with supporting documents was acceptable.
Increase Ventilation - Corridor
CI-2009 IEQc2:Increased Ventlilationposted by Simon Sue on
Hi, we intend to attempt this credit, but come across on our design that we does not have any dedicated FCU serving on this corridor.
Building Height to Street Width Ratio Issues
posted by Shenhao Li on
NPD P1 Walkable Street requires at least 15% of existing and new street frontage within and bordering the project has a minimum "building-height-to-street-width ratio" of 1:3. Can anybody explain
LEED-CI EAc3
CI-2009 EAc3:Measurement and Verificationposted by Tapio Peltonen on
LEED-CI 2009 EAc3 Case 1 Online form has options for sub-metering or central plant. Does the central plant mean that the tenant space is served by e.g.
Form requires photos of moisture control
CI-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Raphael Sperry on
Has anyone else noticed that the form requires "Upload photos documenting moisture protection methods. Photos should include date and time stamp.
Hi,
We are using asphalt as
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by MAUDE PINTAL on
Hi, We are using asphalt as a coating on a concrete floor for interior parking.
Restaurants requirements of recyclabes
CS-2009 MRp1:Storage and Collection of Recyclablesposted by BH . on
Does LEED require some extra recyclng/collector space for office building projects with restaurants, as it is i.e. in BREEAM ? Thanks.
Combining option 1 and 2
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Mathilda Jonsson on
Hi Of all 60 parking spaces only one is located above ground. We really want to put open-grid paving as material for this parking space that is not under ground.
Case 1 Option 2
CI-2009 EAc3:Measurement and Verificationposted by breeze glazer on
We have a situation where the tenant space, is within a building owned, by the owner.