Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Natural Ventilation - modeling air conditioned as baseline?

NC-2009 EAc1:Optimize Energy Performance
posted by  Eric Longfellow  on 

“We are working on an existing classroom and office building at the University of Hawaii, which will undergo a complete remodeling under LEED-NC v.3.0.

1
Thu Apr 7, 2011, 12:14 pm

LEED Certifying a Building with an EnergyStar label

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Dawn Brenner  on 

The downton high-rise I am attempting LEED certification has an EnergyStar label that just expired on Mar 31, 2011.

1
Fri May 27, 2011, 9:52 pm

Weathered Concrete

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Lauren Fakhoury  on 

I'm looking to find the SRI value of weather beige concrete and weathered beige exposed aggregate concrete. Does anyone know where I can find these values?

0

Wall Panels, Tack Boards, Marker Boards

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Cheryl Burkinshaw  on 

We're all still struggling with this credit in our office and trying to determine whether or not we stand a change of getting this point, or if we should abandon it.

1
Fri Apr 8, 2011, 1:28 pm

LEED Documentation - is it required for this point

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Kelley Howell  on 

Our project approach to this point is pretty straightforward. We are using a water quality structure with a sand filter for the entire site.

1
Sat Apr 23, 2011, 9:48 pm

Base building fixtures meet old LEED 2.0, but not LEED CI 2009

CI-2009 WEc1:Water Use Reduction
posted by  Sandra Eremic  on 

Our project occupies (4) out of (10) floors of a building which was LEED 2.0 certified. We are attempting Silver under LEED CI 2009.

1
Fri Apr 22, 2011, 10:22 pm

Transient fixture uses

CS-2009 WEp1:Water Use Reduction
posted by  Carolina Vergnano  on 

Hi There, I've got two projects, one is a shopping mall and the other a health clinic, but I can't figure out the uses for the respective transients.

1
Fri Apr 22, 2011, 10:45 pm

Manufacturer's Stockpile Material

CI-2009 MRc3.1:Materials Reuse
posted by  Gary Keyfauver  on 

I work for a major precast/prestressed manufacturer. Our products are always designed, manufactured and installed for each individual project.

1
Mon Apr 11, 2011, 4:45 pm

AGMBC 2010 - Multi-building industrial plant certification

General forums
posted by  Daniel Brum  on 

Hi there. I am working on an industrial plant 2009 LEED-NC/AGMBC 2010 certification.

1
Sat Apr 23, 2011, 9:41 pm

How to treat reuse furniture in the calculation for FSC wood

CI-2009 MRc7:Certified Wood
posted by  Steve Khouw  on 

In a LEED project, we want to reuse the system furniture from the existing tenancy, the desktop made of wood, but not FSC certified.

1
Fri Apr 22, 2011, 10:08 pm