Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

SSc1 Option 2, Path 4: Heat IE-Nonroof - Parking Stall Calc.

CI-2009 SSc1:Site Selection
posted by  Michelle Bracewell-Musson  on 

The tenant is taking 19000 sf of a 100,000 sf existing building and making it CI. There are 60 underground parking stallas and about 200 outside (unshaded).

1
Tue Apr 5, 2011, 3:40 pm

Number of Parking Spaces

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Laurie McEachern  on 

We are using 2009 for Retail, New Construction, and are being asked for number of parking spaces for employees and number of spaces for customers.

1
Wed Apr 6, 2011, 4:51 pm

Bus and Lightrail access combination?

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Scott Thayer  on 

I'm working on a 100+ unit multifamily apartment project in San Jose. The site is in an area well served by transit overall (relatively central San Jose).

1
Tue Apr 5, 2011, 9:02 pm

vehicles not listed on ACEEE database - non U.S. project

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Jutta Berns  on 

we have just completed our transport survey and seem to have a lot of fuel-efficient vehicles, but most don't appear on the ACEEE list - simply because we tend to have models different from those s

1
Thu Apr 7, 2011, 9:29 pm

Option 4: Combination

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Rubén M. R.  on 

My project is an industrial plant with several buildings (all buildings going for one certification).

1
Tue Apr 12, 2011, 10:33 pm

Is demolition also part of the ESC-plan

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Christian Brücher  on 

Hello, I have got a question concerning a project which will start within the next weeks. Before the start of earth and construction works, an old building on the site has to be demolished.

1
Tue Apr 19, 2011, 7:41 pm

Pressure Drop Adjustment for Lab Buildings

NC-2009 EAp2:Minimum Energy Performance
posted by  John Nott  on 

I am trying to Calculate the required Pressure Drop adjustment for a lab facility, using Addenda "p" from ASHREA 90.1-2007.

1
Thu Apr 28, 2011, 5:26 pm

LEED Healthcare EQc2 - Acoustic Environment

NC-2009 IDc1:Innovation in Design
posted by  Matthew Cunha-Rigby  on 

We are working on a small clinic, and were considering pursuing EQc2, Acoustic Environment from LEED HC as an innovation credit.

1
Wed Apr 6, 2011, 10:07 pm

LEED CS 2009 - "Cold, Dry, Dark, Shell?"

LEED Rating System Selection
posted by  Tony Ricketts  on 

We have been asked to provide designs for a shell space, and the owner would like to attempt LEED certification.

1
Sun Apr 24, 2011, 2:29 am

Meeting WaterSense Specification for Fixtures in WE Credits

General forums
posted by  Jeremy Cressman  on 

I am please to see the draft LEED reference the EPA WaterSense fixture specification, but I have concern -- the current use of WaterSense for urinals and commercial (flushvalve) toilets, does not t

0