Forum quick links
How to show 100% Infiltration
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Kenneth Bailey on
Our project is the only development on a small, flat, island. The surface is sand or sandy topsoil and is extremely porous.
SLL Prereq 1
posted by Peter Doo on
I'm working on a predeveloped 95 acre site at the end of a peninsula. One drives through and existing residential neighborhood that does not have many diverse uses.
GIB Credit 7 Minimize Site Disturbance
posted by Peter Doo on
Project site includes upen space that is undeveloped but previously "disturbed" in that it is a turf field (no trees or native plants). Developer proposes to build on this land.
context
posted by Tristan Roberts on
Jean, in answering this question it would help to know what it is about. Is this about rating system selection, MPR compliance, an EAc1 issue, or something else?
Lighting in a Assisted Living Facility
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by David Jennings on
I am looking at trying to reach the 90% requirement on IEQ6.1.
Capturing heat recapture for absorption dhillers
NC-2009 EAc1:Optimize Energy Performanceposted by Vanessa Seibert on
We are working on a college campus that will have a new central plant. We have a onsite micro turbine generators that provide power to the site.
Case 1 Option 1 - how to group rooms if identical construction?
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Renee Shirey on
Has anybody grouped room types for Table IEQp3-1? I am trying to understand exactly how to do this. Simplified scenario: The project has 10 small 100 SF rooms, exactly the same.
Calculation Spreadsheet
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Cynthia Brantley on
Does anyone have a copy of the Calculation Spreadsheet that does not require the use of macros.
Alternative Transportation
EBOM-2009 SSc4:Alternative Commuting Transportationposted by gwenedd murray on
I think I might know this answer but I need some advice to confirm my hunch....The project I am working on is a 5,000sf university owned educational center located 30 min from an urban area.
PV & SRECS
Schools-2009 EAc2:On-Site Renewable Energyposted by James Geers on
If a project installs a PV system but sells a SREC for that system can it still qualify for EA c2?