Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

WELL V2 Thermal Comfort T01 Thermal Performance

WELL v1 Building Standard Tip Sheet
posted by  shashank gangil  on 

For T01 Thermal Performance Precondition, i am trying to understand whether we need to submit any documents at the time of design document submission?

0

LEED Charrette

Healthcare-v4 IPp1:Integrated project planning and design
posted by  Molly Jones  on 

Has anyone successfully conducted the half day charrette in segments (2 days @ 2 hours each)?

 

2
Thu Jul 8, 2021, 5:51 am

Extension for review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Lawrence Lile  on 

We have had a preliminary review comment that highlights a missed prerequisite. We will require more than the 25 days allowed for our response.

5
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Thu Jul 8, 2021, 4:22 am

Smoking Floor

Hospitality-NC-v4 EQp2:Environmental Tobacco Smoke Control
posted by  Summer Gorder  on 

I am working for a Native American Tribal owner who would like to pursue LEEDv4 for a hotel adjacent to their Casino, but there is an expectation to have a designated smoking floor.

2
Thu Jul 8, 2021, 3:41 am

Emissions Certification - Certified Labs under ISO 17025?

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Gregor Braugman  on 

I recently had a pecora product rejected from the Adhesives & Sealants category because the reviewer said that the emissions report from Intertek Labs was not valid becuase it did not list

0

Operational waste baseline

SD Leaders
posted by  Kate Bubriski  on 

Does anyone know of a source for finding the operational solid waste generated by typical building/use types (weight/sf)? I couldn't find anything on LEED, True, or EPA.

0

Would Process load considered as Plug Load?

EBOM-v4 EAc5:Advanced energy metering
posted by  ERM Korea  on 

Hello!

To implement Advanced energy metering and Builidng Energy Management System (BEMS), Energy audit Level II was conducted.

0

Documenting Minimum IAQ performance of C&S warehouse and Distribution facilities

CS-v4 EQp1:Minimum indoor air quality performance
posted by  Lawrence Rennell  on 

LEED 2009 had a button to click to indicate that all mechanical installations would be covered by the Tenant Lease and Sales Agrrement.

1
Thu Jul 8, 2021, 4:28 am

Buildable Land

ND-Plan-v4 NPDc2:Compact development
posted by  Marc Mondor  on 

We are having a bit of difficulty determining exactly what to include as "buildable" land.  We have received feedback that even if open space is allowed to include sidewalks or plaza areas, it

1
Wed Jul 7, 2021, 4:34 pm

Moody Nolan is hiring!

SD Leaders
posted by  Lindsey Morris  on 

Hi SDL Group -

Moody Nolan is actively seeking a new hire to help support our sustainability needs!

0