Forum quick links
Insulation requirements
CS-2009 EAp2:Minimum Energy Performanceposted by Gabriela Hernández Castillo on
Our LEED building consits on an 39 stories speculative office building that is on top of a 3 stories retail building. The retail will not apply for LEED certification.
Undeveloped land - definition
Schools-2009 SSc1:Site Selectionposted by Gendel Metlitsky on
The 3.5 acre project site is wooded with mature trees.
Asphalt Roll Roof Recycling
NC-2009 MRc2:Construction Waste Managementposted by Sabrina B on
I am working on a existing building renovation. The existing roof, which will be demo'd, is asphalt roll with batt insulation underneath.
AV equipment
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Sheela I on
Where can i check to see which AV equipment qualify for energy star.
EAc6 review comment.
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Jason Biondi on
Has anybody recieved a comment on this credit along the lines of, "provide a summary of actions relating to energy efficiency and emissions reductions estimate the relative contribution of each act
Recycle Station
CI-2009 MRp1:Storage and Collection of Recyclablesposted by JENNIFER COMEAU on
There's been a continuous question within our projects regarding the recycling situation.
Both electric heat pump and district energy, what system?
NC-2009 EAp2:Minimum Energy Performanceposted by Emma Eliasson on
I have a multifamily building which is supplied with heat from both an electric heat pump and district energy. How do I choose between system 1 and 2? Which rules do apply?
Prerequisite Denied
CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Ellen Mitchell on
This issue seemed to be in question on a few other posts so I thought I would weigh in on a recent experience.