BMPs from Stormwater Management Manual for Western Washington
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Jutta Berns on
for SSp1 would it be acceptable to choose BMPs from the Stormwater Management Manual for Western Washington, which is referenced for the GIBp4 prerequisite in LEED Neighborhood Development?
Late implementation due to temporary cancelation of project
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Daniela Castro Salgado on
Hi everyone! Here's a tricky one... I am a little confused about the possibility of achieving SSp1 on a project.
Definition of Site Area?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ellen Mitchell on
This may be a dumb question, but I have a project that falls under Case 3 - provide vegetated open space equal to 20% of the project's site area.
Reflecting Pool
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Rosana Correa on
Hello everyone! Will areas covered with reflecting pools count as open space areas? Thanks!
lighting and plug loads separate?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Markus Henning on
I am working on a LEED-CS 2009 project. We will reach Credit EA 5.2 Measurement and Verification – Tenant Submetering.
Option 1: Without tenant, does not meet pre-requisite.
CS-2009 EAp2:Minimum Energy Performanceposted by Whitney Dorn on
The client is developing without a tenant and is deferring major HVAC components to the tenant build-out (air handlers.) Without air handlers, the energy model does not meet pre-requisite with opt