posted by  Mike Barker  on 

Rosamaria, in my humble opnion the key to it all is the intergration of the M&V plan and the energy modelling. You can use IPMVP to build baselines for anything.

5
Default Avatar
Principal : Energy / Electrical Engineer
BuildingPhysics South Africa
LEEDuser Basic Member
94 thumbs up
Sat Mar 24, 2012, 3:30 am

Commissioning of Systems not required in prereq

NC-2009 EAc3:Enhanced Commissioning
posted by  Shauna Sproul  on 

Can points be achieved in innovation and design for commissioning of systems not required in prereq, for example the building envelope? I understand 2012 is addressing this, but what about 2009? I

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Fri Mar 23, 2012, 9:16 pm

CxA designation question

NC-2009 EAc3:Enhanced Commissioning
posted by  Blas Beristain  on 

Hello! We are involved in a project of a new headquarters of an architectural firm. In this project, the owner will be the architectural firm.

5
Sustainability Manager
YR&G
LEEDuser Basic Member
55 thumbs up
Fri Mar 23, 2012, 8:57 pm

CxA Contract Question

NC-2009 EAc3:Enhanced Commissioning
posted by  Mark Haynie  on 

We hold a contract for construction of a project as the General Contractor. We also have contracted with the design firm (Architect) for the project.

2
Default Avatar
Commissioning Engineer
LEEDuser Basic Member
15 thumbs up
Fri Mar 23, 2012, 8:52 pm

Round-up

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  SIG - Sustainability Main Account  on 

I'd like to confirm that Round-Up Pro (EPA # 524-475) is okay to use for weed control in sidewalk cracks.

2
Sustainability Professional
LEEDuser Expert
430 thumbs up
Fri Mar 23, 2012, 8:17 pm

LEED 2012 Should Be 2014

General forums
posted by  Gary Shlifer MS, LEED AP BD+C, Homes  on 

I am an advocate for raising the bar. However, significant market buy-in has not occured. We need to stay at LEED 2009 levels for more than just 2 years. It should be more like 5.

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri Mar 23, 2012, 4:37 pm

All indoor water is outside of project owner scope

CS-2009 WEp1:Water Use Reduction
posted by  Mary Frances Stotler  on 

I'm trying to figure out how to document compliance with WEp1 and WEc3. I'm dealing with a situation where all indoor water use is part of the tenant build-out.

3
Fri Mar 23, 2012, 4:23 pm

Rainwater Harvesting? (Rainwater Management Credit)

General forums
posted by  Melissa Wrolstad  on 

It is unclear whether or not rainwater harvesting techniques are allowed in the reduction calculation for the Rainwater Management credit. If they are not allowed, why?

4
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Fri Mar 23, 2012, 3:30 pm

Secure bicycle racks and secure bicycle storage

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Caroline Ma  on 

Any difference between Secure bicycle racks and secure bicycle storage? In CS project with area larger that 300,000 sq.ft. (CS case 2), we need to provide secure bicycle storage.

3
Sustainability Consultant
Skanska Czech Republic
LEEDuser Basic Member
128 thumbs up
Thu Mar 22, 2012, 10:52 pm

General - LEED 2012

General forums
posted by  Pat Thomas  on 

We project 90+% of the credits will cost more to implement in LEED 2012 than the current cost in LEED 2009 and that is not including additional design team fees or LEED documentation.