Forum quick links
Outdoor Amphitheater
posted by Keelan Kaiser on
We are working on a project with 4000 seat outdoor, but covered, amphitheater with a 20,000 s.f. back of house/administrative building.
Future Tenant Improvements in a LEED NC Project
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by James Del Monaco on
I have a Student Union project which has spaces ranging from offices to classrooms to theatres.
Contradiction for Pressurized Hallways
NC-2009 IEQp1:Minimum IAQ Performanceposted by Omer Moltay on
Some sources (including LEED User) suggest that hallways pressurized with mechanical ventilation can be used to ventilate spaces in dwelling units that are adjacent to the unit entry door through i
Natural Stone Flooring need FloorScore Certificate?
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Caroline Ma on
Do we need to find the natural stone flooring e.g. marble, granite with FloorScore Certificate? Or we can simply use natural stone flooring without any certificate to score for this credit?
Temporary construction material left on-site.
NC-2009 MRc2:Construction Waste Managementposted by Keith Robertson on
Should MRc2 include temporary construction materials that are left on-site. In particular, it is common for a crane-base, or temporary concrete dead-men or casting beds to be left on-site.
Areas to be considered
CS-2009 IEQp1:Minimum IAQ Performanceposted by Angela Saggin on
Hi! What areas/rooms should we consider inside an appartment for the calculation of naturally ventilated spaces?
Sauna
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Jim Park on
I am working on a hotel project, which would use standard fixtures (no high-efficiency fixtures), but would still earn 2 points under WEc2, and 2 points under WEc3 due to utilizing recycled gray wa
LEED NC - Tenant Commissioning
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jennifer Preston on
Our base building will be fully commissioning, but the small first floor tenant fit out is not in the scope of the project, beyond providing base building systems.
Option 1 and Option 2 Combined?
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Jason McIntyre on
I have a project that has a detached parking garage, of which has spaces on the top level (uncovered). I also have surface parking spaces on the site...
EAp1 Review Comments
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by matthew strong on
We recently received review comments asking us to list energy demand savings and maintenance cost savings for our EEMs.