Forum quick links
IEQp1 required signatory
NC-2009 IEQp1:Minimum IAQ Performanceposted by Anne-Maria Vierinen on
Our HVAC designer is also the ventilation systems designer on our project.
PEAK Transients--What makes for PEAK? Not TOTALLY Occupied?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Brooks Critchfield on
When calculating the PEAK transients, do we need to plan for every assembly space, every classroom, every office, every etc.
Charging stations and Calgreen
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Deborah Lucking on
Our project in California is pursuing SSc4.3 by providing charging stations.
Permanent Monitoring Devices
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Scott Rosch on
We have a smaller government project that does not have the need or budget for a building automation system, which we have used as the monitoring equipment for this credit previously.
EAc6 in Abu Dhabi
NC-2009 EAc6:Green powerposted by Scott Bixby on
I am trying to calculate the REC quantity required for a building in the UAE to get EAc6 (Green Power), but noticed that the CBECS method does not apply to buildings outside the US.
Strategy changes after construction review
posted by Michael Smithing on
1.
PIf4 Interior Renderings/Drawings
posted by David Menk on
For the requirement of uploading interior renderings or drawings during the design phase -- what kind of drawings are acceptable?
SCS Gold Certificate
Schools-2009 IEQc4.5:Low-Emitting Materials—Furniture and Furnishingsposted by Suzanne Allerton on
Will the above certificate in place of one type furniture item be acceptable for this credit?
Pressure Drop Adjustment when no HVAC has been designed
CS-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Dear Forum, I am modeling a building which has no heating or cooling system in the design, so, according to Appendix G, I have modeled these systems exactly the same as in the baseline design.
Commissioning firm instead of a specific person?
NC-2009 EAc3:Enhanced Commissioningposted by Veronika Sundberg on
Since our project is quit big we have hired an independent firm for our commissioning of the project and not a single person.