Forum quick links
Particulate Matter Removal
CS-2009 IEQp1:Minimum IAQ Performanceposted by Paula Hernandez on
Hi to all of you, as per Standard 62.1-2007, in Section 5.9, one of the minimum requirements for mechanically ventilated spaces, a MERV 6 filter shall be provided upstream of all cooling coils.
Radiant Heat Mats
CI-2009 EAp2:Minimum Energy Performanceposted by Holly Himes on
Has anyone used these on a project and which credit would then fall under if any?
Dear All,
I am new on LEED
posted by Andre peixe on
Dear All, I am new on LEED language and I am using this very interesting forum to learn something (actually a lot!) about it. I have a similar situation.
Developing the plan post-construction
NC-2009 EAc5:Measurement and Verificationposted by Maura Adams on
Is there any reason that we couldn't develop an M&V plan post-construction, assuming we have the necessary controls in place?
Re: Existing Building with an outbuilding addition
posted by David Posada on
Chris, From what you describe, it sounds like the two buildings are substantially similar.
re: LEED Project Registration for Sports Facilities
posted by David Posada on
This does sound like one project, and in past CIRs and reviews the GBCI has indicated project teams have some latitude to define the LEED site boundary as best fits the situation.
Bypaas VAVs and AHUs
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by monu goyal on
Hello to all, my query is our project is two floors in a 9 floor building. The base building developer has provided AHUs and chilled water supply.
Master Site Application
posted by Omer Moltay on
Dear All, We are using the Master Site approach for a development with two buildings to be LEED CS certified. We are at the precertification stage.
IAQ Testing AFTER Occupancy?
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by buddy pribish on
I am aware of the verbiage in the LEED reference guide for IAQ testing to be completed PRIOR to occupancy, but considering that the flushout method can be completed DURING occupancy, I was wonderin
Shower for a transportation hub
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Kevin Meyer on
We are working on a transportation hub next to a stadium. The project won't have any full time employes on site.