LEED EBOM for warehouses?

LEED Rating System Selection
posted by  Diego Prada  on 

Hi everyone I would like to know if a mix-use office/retail/ warehouse complex can apply for EBOM.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 25, 2011, 5:36 pm

Phased Project Rating System Selection- NC or CI/ CS

General forums
posted by  Aaron Desatnik  on 

I need to determine which rating system to use for a project where the client owns the whole building and is planning to renovate different floors in separate phases over four years.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 25, 2011, 4:56 pm

"90% Minimum of building occupants"

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Sandra Heiser  on 

The requirement reads " Provide individual lighting controls for 90% (minimum) of the building occupants..." Is this based on the FTE? Or does it mean 90% of the individual workspaces?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 25, 2011, 3:40 pm

WE Prerequisite qualification for a minimal CS project

CS-2009 WEp1:Water Use Reduction
posted by  Tak Louie  on 

Our client is building a Retail center for a large grocer with small satellite retail spaces. The balance of the building is simply a parking garage with an enclosed and tempered elevator lobby.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 25, 2011, 1:30 pm

Option 3, approach 2: Random selection

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  gwenedd murray  on 

This building is over 300,000 sf and located close to public transportation. Half of the tenants are government agencies.

3
Mon Apr 25, 2011, 1:20 pm
3
Default Avatar
AIA, LEED BD+C
Gensler
LEEDuser Basic Member
80 thumbs up
Sun Apr 24, 2011, 10:25 pm
3
Default Avatar
WSP
LEEDuser Basic Member
53 thumbs up
Sun Apr 24, 2011, 8:09 pm

Natural Ventilation - Single Space

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Omer Moltay  on 

Almost all the spaces in our building is mechanically ventilated, except the entrance lobby which receives outside air through revolving doors. The revolving door opening area and the 8 m.

3
Sun Apr 24, 2011, 12:58 am

Irrigation - Baseline case

NC-2009 WEc1:Water Efficient Landscaping
posted by  Maya Karkour  on 

Hello, The guidance is not really clear on what to put in the baseline case. It only says that we need to specify typical landscaping practices.