Forum quick links
LEED EBOM for warehouses?
posted by Diego Prada on
Hi everyone I would like to know if a mix-use office/retail/ warehouse complex can apply for EBOM.
Phased Project Rating System Selection- NC or CI/ CS
posted by Aaron Desatnik on
I need to determine which rating system to use for a project where the client owns the whole building and is planning to renovate different floors in separate phases over four years.
"90% Minimum of building occupants"
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Sandra Heiser on
The requirement reads " Provide individual lighting controls for 90% (minimum) of the building occupants..." Is this based on the FTE? Or does it mean 90% of the individual workspaces?
WE Prerequisite qualification for a minimal CS project
CS-2009 WEp1:Water Use Reductionposted by Tak Louie on
Our client is building a Retail center for a large grocer with small satellite retail spaces. The balance of the building is simply a parking garage with an enclosed and tempered elevator lobby.
Option 3, approach 2: Random selection
EBOM-2009 SSc4:Alternative Commuting Transportationposted by gwenedd murray on
This building is over 300,000 sf and located close to public transportation. Half of the tenants are government agencies.
Natural Ventilation - Single Space
NC-2009 IEQp1:Minimum IAQ Performanceposted by Omer Moltay on
Almost all the spaces in our building is mechanically ventilated, except the entrance lobby which receives outside air through revolving doors. The revolving door opening area and the 8 m.
Irrigation - Baseline case
NC-2009 WEc1:Water Efficient Landscapingposted by Maya Karkour on
Hello, The guidance is not really clear on what to put in the baseline case. It only says that we need to specify typical landscaping practices.