Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Further normalized EUI

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  SENGATHIR SELVAN  on 

Hi there, in our efforts to achieve LEED EBOM certification for a production facility (garment washing plant) in Dhaka, we have implemented energy conservation measures.

1
Thu Oct 25, 2012, 3:23 pm

Fan's power

CS-2009 EAp2:Minimum Energy Performance
posted by  FABIO VIERO  on 

Hello all, two little questions about fan's power: - Which is exactly the difference between demand fan power, peak fan power and fan power allowance? - How do i have to relate baseline and propose

1
Mon Oct 22, 2012, 2:33 pm

Landscape Factors for Baseline Case

CS-2009 WEc1:Water Efficient Landscaping
posted by  Oliver Lange  on 

I would like to know, where I can find a good source for the specific landscape factors (species-, density- and microclimate factor) of plants for the calculations in the baseline case. Is it even

1
Wed Dec 5, 2012, 5:10 pm

EER requirement and VFD air cooled equipment - Help

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Tiombe Parrish  on 

We have a proposed LEED Silver office building under LEED 2009 for Commercial Interiors.

1
Thu Oct 25, 2012, 1:49 pm

Materials Which Always Get Review Comments

NC-2009 MRc4:Recycled Content
posted by  Hernando Miranda  on 

It is obvious that the LEED reviewers use a set of predetermined comments for certain material claims made.

0

new PIf2 forum and resource page

General forums
posted by  Tristan Roberts  on 

Hello, LEEDuser now has a dedicate forum page for PIf2, where we hope to add other resources over time. If you have a question on PIf2, please post it there!

0

LEED-ND forums and credit language

General forums
posted by  Tristan Roberts  on 

Hello LEED-ND users!

0

SF used for energy model vs. building GSF

NC-2009 EAp2:Minimum Energy Performance
posted by  Craig Flandermeyer  on 

Our building energy model s.f.(table eap2-1) 74,000+/- does not match the gross building s.f. reported in 1.1A 94,000+/-. The difference is approximately 20,000 s.f.

1
Mon Oct 22, 2012, 11:36 pm

Choosing Baseline HVAC-System in climate zone 1b

NC-2009 EAc1:Optimize Energy Performance
posted by  Johannes Hopf  on 

Hi, 90.1-2007 confuses me a little. Our project (4 story, 9000 m²/90000 ft²) is located in climate zone 1b. The proposed building is heated by an electrical heatpump.

1
Tue Oct 23, 2012, 1:43 pm

Major Renvation Baseline Building Envelope Selection for Title 2

NC-2009 EAc1:Optimize Energy Performance
posted by  Jayme Buresh  on 

Hi, I know that Appendix G states that if the envelope of a building is renovated, then the existing envelope construction is used for the baseline.

0