Forum quick links
GIBc8—Stormwater Management
posted by Wayne Ding on
The credit requires "the percentile rainfall event is the total rainfall on a given day in the record that is greater than or equal to X percent of all rainfall events over a 20-to 40+-year period"
Athena Eco Calculator - Cement replacement
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Kelly Roberts on
Can we scale our square footage inputs linearally to account for cement replacement in excess of 20%?
Which cost of materials to use?
Schools-2009 MRc5:Regional Materialsposted by Maya Karkour on
Dear all, The retail price of a certain product is $15 (anyone can buy it from the supplier for $15).
Multiple Occupancy
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Robert Barrett on
I would assume that in a multiple occupancy CS building, the shower and changing room(s) would need to be in a location that is readily accessible to all, like common space.
Overlapping
EBOM-2009 IOc3:Documenting sustainable building cost impactsposted by Hatice G. on
Can the performance period overlap the historical year? Or should the historical years end before the performance period starts?
Regional Materials
Schools-2009 MRc5:Regional Materialsposted by Rebecca Griffith on
When calculating distance between the manufacturing plant & the project site, is the distance I should use, actual travel distance by land, or by "how the crow flies"?
LEED certification for factories
posted by Tristan Roberts on
Rosamaria, I can't immediately think of any well-known examples, but it has been done and is being done.
LEED for Retail: Qualifying for Option 4 (Parking Capacity)
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by John Klein on
LEED for Retail Option 4 Path 1 states "size parking capacity must meet but not exceed minimum local zoning requirements".
MRc4 forum and information
posted by Tristan Roberts on
Hi Nancy, I see that you're a LEEDuser member, which is great since you are new to LEED.
Open plan (individual workstations) with access to thermostat
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Karen Stewart on
We have an open plan office area that contains 24 workstations. There are 3 thermostats that control the temperature in this open office plan area.